1 / 12

Eleanor Ewry SRWG Study Program Subgroup Chair

Eleanor Ewry SRWG Study Program Subgroup Chair. Annual Study Program Subgroup Update March 2014 WECC HQ. Agenda. Annual Study Program SOW Annual Survey Results Annual Study Program Results Log Standard Disturbance List Base Case Compilation Schedule Light Load Assumptions.

tanith
Download Presentation

Eleanor Ewry SRWG Study Program Subgroup Chair

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Eleanor EwrySRWG Study Program Subgroup Chair Annual Study Program Subgroup Update March 2014 WECC HQ

  2. Agenda • Annual Study Program SOW • Annual Survey Results • Annual Study Program Results Log • Standard Disturbance List • Base Case Compilation Schedule • Light Load Assumptions

  3. Annual Study Program SOW • Summary of PCC Task Force • Focus on high quality base cases • Run Standard Disturbances on all base cases • Allow for a “special study” • No more Performance Log • Track issues in ASP Results Log • SRWG needs to implement PCC findings

  4. Annual Study Program SOW • New Annual Study Program Scope of Work document posted on meeting website • Replace existing Study Program Procedures and associated Exceptions List • Status?

  5. Annual Survey • Annual Survey was sent out Dec. 12th • Responses due by Jan. 8th • Received responses from 7 entities • Additional disturbances were provided by other means

  6. Annual Study Program Results Log • Review draft log posted on meeting website • Standard Disturbance List • Are proposed disturbances seasonal issues?

  7. BaseCase Compilation Schedule • Current study area in the rotation is California (between Path 15 and West of Colorado River) • Received 2 requests for scenario cases in this area • Significant feedback in support of the format from the 2014 schedule • Use one scenario case for the off-cycle 10-year planning case • Suggestion to reserve one spot for a model validation case in support of MOD-033

  8. Light Load Assumptions • TSS requested that we provide a better description for light load conditions in the basecases.

  9. Light Load Assumptions * Curves were compiled from WECC RC data. Plotted value is net generation. Gross generation would be approximately 5% higher.

  10. Light Load Assumptions • Western Interconnection load in the 13LS1 basecase: • 108,645 MW • Western Interconnection load in the 13LW2 / 14LW1 basecases: • 102,931 MW / 103,632 MW • Request was received for a set of three summer cases: • Heavy Summer (170 GW) • Light Summer (90 GW) – represents loading between 2am and 4am • Intermediate Summer (115 – 120 GW)

  11. Light Load Assumptions • Suggestions • Choose some percentile on the Load Duration Curve to represent • 2am to 4am load on actual peak day for season being represented • Scale by forecasted load growth

  12. Questions?