Standards Update. Steve Rueckert Director of Standards. TOP/IRO Revisions Project a result of FERC proposal to remand several IRO and TOP standards. Removed critical reliability aspects Includes three TOP and six IRO standards Two new defined terms Real-time Assessment
E N D
Standards Update Steve Rueckert Director of Standards Western Electricity Coordinating Council
TOP/IRO Revisions • Project a result of FERC proposal to remand several IRO and TOP standards. • Removed critical reliability aspects • Includes three TOP and six IRO standards • Two new defined terms • Real-time Assessment • Operational Planning Analysis • Ballot September 10-19 Current NERC Projects Western Electricity Coordinating Council
BAL-002-2 • Clarifies that a responsible entity is not subject to returning its reporting ACE to the recovery state if: • It is experiencing an EEA • A Balancing Contingency Event exceeds its MSSC • Fourth Ballot – closes October 2 Current NERC Projects Western Electricity Coordinating Council
Ten additional projects that will be balloted before October 22 • See the NERC Weekly Standards and Compliance Bulletin • http://www.nerc.com/pa/Stand/Pages/default.aspx • 2015-2017 RSDP states that the pace of work will likely become more deliberate Current NERC Projects Western Electricity Coordinating Council
VAR-002-WECC-2 Automatic Voltage Regulator • VAR-501-WECC-2 Power System Stabilizer • Retirement of P81-type Requirements • Required Documentation • 83% Quorum • 100% Weighted Sector Approval • Before the Board for approval on September 18 • If approved will be sent to NERC/FERC for approval Recent WECC Ballots Western Electricity Coordinating Council
INT-018-WECC-CRT-1 Use of e-Tag Energy Product Codes Specific to the WECC • Reformatted for consistency • Definitions removed and added to Glossary • No changes to the definitions • 82% Quorum • 97.2% Weighted Sector Approval • Before the Board for approval on September 18 Recent WECC Ballots Western Electricity Coordinating Council
WECC-0101 Generator Validation Policy Conversion • Proposes to incorporate elements from the WECC Generator Testing and Validation Policy into mandatory standards as a WECC Regional Variance • Lowers the threshold for testing from 75 MW to 20 MW • Requires validation every five years rather than every ten years Current WECC Projects Western Electricity Coordinating Council
WECC-0107 PSS Design and Performance • Proposes to incorporate elements from the WECC Policy Statement on Power System Stabilizers and the Tuning Guide into VAR-501-WECC-2 • Would continue to require PSS to be in service • Would require PSS installation • Would require PSS tuning Current WECC Projects Western Electricity Coordinating Council
WECC-0108 Modification of INT-021-WECC-CRT-1.3 • WIT Checkout Confirmation • Process for scheduling and checkout between BAs needs to be clarified • Will serve as the primary means for confirmation for NET Scheduled Interchange and NET Actual Interchange • Drafting team has been solicited • Poor response - window extended until September 15 Current WECC Projects Western Electricity Coordinating Council
WECC-0110 INT-011-WECC-CRT-2 Ten Minute Recallable e-Tag Functionality for Reserves • Define the use of ten-minute recallable e-Tags as a reserve product. • Conflicts with BAL-002-WECC-2 • Needs to be modified • Drafting team has been solicited • Poor response - window extended until September 15 Current WECC Projects Western Electricity Coordinating Council