An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Summit in the Wasatch John Britting Wasatch Front Regional Council

  2. Context – Fall 2001 • First light rail line was very successful • Local transit priority was commuter rail • Transit dedicated sales tax increase was passed • Bold promises made re: CRT • Initial forecasts from corridor study were high (~35,000) and made FTA very uncomfortable • Lawsuits over analytical methods • My boss was handing over the reigns to me

  3. Step 1: Engage FTA • Hired PB Consult to upgrade models • Brought in FHWA/FTA for a focused peer review of models in January, 2002 • Opened up the black box and welcomed feedback • Short-term and longer term priorities for model improvements were developed • Synopsis: make every step better in short-term

  4. Priorities – FTA Perspective • Estimate/calibrate & validate NL mode choice models using local data • Pay close attention to path-building • Identify CW/MD/NT markets • Incorporate segmentation into distribution • Consider handling unique markets differently (e.g. college trips and airport trips) • Thorough validation of network speeds

  5. Step 2: Progress as of 6/03 • Borrow NL mode choice models and calibrate using local data (collected on-board data) • Little improvement to path-building • Identified CW/MD/NT markets • Did not incorporate segmentation into distribution • Used data on student addresses and an airport users survey to developed unique trip tables • Thorough validation of network speeds

  6. Step 3: Continue Dialog • Questions remained about forecasts • High non-work benefits • Significant reverse commute • Questions remained about validation • Summarized rail trips by # transfers and attraction district for each trip purpose and auto segment (example next slide) • Agreed on a range for forecasts and helped them tell the story with some confidence • CRT was given a “recommended”

  7. Step 4: Identify Illogical Benefits

  8. Step 5: Progress as of 6/04 • Estimated/calibrated & validated NL mode choice models using local data • Transit path-building informed by on-board and model estimation (consistent weights; 95% of on-board records had access; reasonable xfer rates) • Identified CW/MD/NT markets • 0-car HBW distribution w/composite impedance • Used data on student addresses and an airport users survey to developed unique trip tables • Thorough validation of auto speeds; model relating transit speeds to auto speeds

  9. Most Important Step - Validate • Trips by purpose, market, period and mode • Boardings by route and route group • District-level trip tables • Results from on-board assignment • % person trips with a transit path, by market • % transit trips for each market by mode and transfers • % walk-rail that are walk-bus-rail • Expressed constants/parameters in terms of IVT

  10. Threat 1 – naïve calibration/validation • Extensive documentation • Asked FTA what they wanted to see • Built a calibration routine into models (in TP+) and several scripts to automate reporting of key indicators

  11. Threat 2 – Incorrect Travel Markets • Estimated, calibrated and validated a best-practice auto ownership model • 0-car HBW distribution • College and Airport trip tables

  12. Threat 3 – Odd Properties • FTA reviewed and commented on model estimation results, model functional form and implementation • Expressed all parameters and coefficients in terms of equivalent in-vehicle minutes

  13. Threat 4 – Transit Path Builder • Overhaul of walk/drive support link generation models • Used initial estimation results to refine path-building weights • Built MC estimation file 2-3 times • Assigned transit on-board • Quality of O-D data • Assure access where trips occurred • Refine path-building parameters

  14. Threat 5 – Inaccurate Speeds • Performed extensive auto speed data collection • Used data to calibrate and validate auto assignment • Built model to forecast transit speeds from auto speeds; based on facility type and auto speed – model does a very good job

  15. How we’ve used Summit • Network quality control – does the distribution of benefits seem reasonable? • Tell the story of who benefits • LRP - benefits per capita analysis • Identify symptoms of quirks in the models

  16. Concerns with Summit Process • A lot of work for me • Not sure FTA has staff to go through similar process across the country • How do you get a baseline approved? • The cap has to be flexible • Old-school program • Summit proves models are not perfect, which we all should already understand

  17. Case for Higher Cap • Differences in transit utility may reasonably exceed the cap of 45 minutes • Travel time differences (IVT and OVT) • Transfer differences • Unobserved attributes (i.e. constants) • This assumes you minimize or eliminate • Coverage differences • Service level differences • Access differences

  18. Recommendations • FTA should ask for specific items to be documented • Process to justify cap increases • Process for defining range of key indicators • Modelers, not PM’s, need to open up to FTA early and often • Work with Citilabs, Caliper, etc., to improve Summit • Recognize inherent imperfections and overcome most critical • Start process early

  19. Final Comment Our commuter rail forecast went down from 35,000 boardings to 26,000 and our forecast is much better.