1 / 9

After-the-Fact Shoreline Alteration/ Dredge and Fill Request John and Terri Von Achen District 5

Environmental Protection Division. After-the-Fact Shoreline Alteration/ Dredge and Fill Request John and Terri Von Achen District 5. July 31, 2007. Location Map. Subject Site. Aerial of Site. Current Shoreline Condition. Site Plan. Cross Section. Action Requested. ACTION REQUESTED:

Download Presentation

After-the-Fact Shoreline Alteration/ Dredge and Fill Request John and Terri Von Achen District 5

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Environmental Protection Division After-the-Fact Shoreline Alteration/Dredge and Fill RequestJohn and Terri Von AchenDistrict 5 July 31, 2007

  2. Location Map

  3. Subject Site

  4. Aerial of Site

  5. Current Shoreline Condition

  6. Site Plan

  7. Cross Section

  8. Action Requested ACTION REQUESTED: Approval of the After the Fact Shoreline Alteration/Dredge and Fill permit to construct a vertical seawall on their property, subject to the conditions listed in the staff report.

  9. Environmental Protection Division 800 Mercy Drive Orlando, Florida 32808 407.836.1400 FAX 407.836.1499

More Related