120 likes | 291 Views
Pile-Up Pulse Decomposition. Jia-Ye Chen 2007.08.29. Outline. Much tighter pile-up pulse selection with different ADC & TDC cut conditions Residual of Pad, Residual of Z and Efficiency (90,000 events with different targets) Event display to check track pile-up (vertex point is out of target).
E N D
Pile-Up Pulse Decomposition Jia-Ye Chen 2007.08.29
Outline • Much tighter pile-up pulse selection with different ADC & TDC cut conditions • Residual of Pad, Residual of Z and Efficiency (90,000 events with different targets) • Event display to check track pile-up (vertex point is out of target)
Much Tighter Selection Algorithm ADC (2,3,4,5,8,10,16,20) TDC (3,4,5,6,7,8,9,10)
Residual of Pad Cu C CH2
Residual of Z Cu C CH2
Efficiency Cu C CH2
Track Pile-up Check Criteria • trkQualt = 1 • numHitst > 5 • qq1 * qq2 = -1 • momt(4,:) < 1.0 GeV/c • separation between vertex point and target center > 40 mm