40 likes | 147 Views
Trip Level Scheduling. Presented by:. Rex Clark. Vice President , Sales. Trip Level Scheduling. DH. BR. DO. PU. Run Availabilities. The next trip to be real-time re-optimized was scheduled to ‘Virtual run 2’ during the batch optimization. Preliminary Schedules. Virtual run 1.
E N D
Trip Level Scheduling Presented by: Rex Clark Vice President, Sales
Trip Level Scheduling DH BR DO PU Run Availabilities The next trip to be real-time re-optimized was scheduled to ‘Virtual run 2’ during the batch optimization Preliminary Schedules Virtual run 1 Virtual run 2 OTP The trip is automatically assigned and dispatched to ‘Run 1’ without the need to manually ‘switch’ from one run to another. GPS PU DO PU PU PU Actual Schedules Run 1 Run 2 Current Time 1
Trip Level Scheduling • Rex Clark • Vice President of Sales • rex.clark@ecolane.com • tel. (623) 444-2667 • Cell (530) 383-1414 • 14709 N. 137th Ln. • Surprise, AZ 85379