Toolik Field Station Long Range Facilities Plan Science Support Vision Workshop August 2012

Toolik Field Station Long Range Facilities Plan Science Support Vision Workshop August 2012. TFS Long Range Facilities Plan. Org Chart. CPS. ARSLS Management (Mike Mc). Alaska Ops (Marin). Facilities Management (Jud). TFS Ops Manager (Mike A). Alaska Science (Naomi).

Download Presentation

Toolik Field Station Long Range Facilities Plan Science Support Vision Workshop August 2012

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Toolik Field StationLong Range Facilities PlanScience Support Vision WorkshopAugust 2012

  2. TFS Long Range Facilities Plan Org Chart CPS ARSLS Management (Mike Mc) Alaska Ops (Marin) Facilities Management (Jud) TFS Ops Manager (Mike A) Alaska Science (Naomi) Construction Management (Jay B) Engineering (Jeff S) Toolik Construction (Jason N) Maintenance Lead (Thom M) TFS Maintenance (Jeb / Faye) Renewables (Tracy D) IT/Comms (SRI)

  3. TFS Long Range Facilities Plan • LRFP Timeline and Status • In development since 2009 • Draft Final document distributed 2011 • Feedback received from stakeholders • Final review/approval underway • A “Living Document”, revised as necessary in the future

  4. TFS Long Range Facilities Plan • Why “Finalize” the LRFP? • Environmental Assessment (EA)required for new construction • EA must reference a comprehensive document for site development (eg – LRFP) • Planning and funding for large capital projects requires long lead times • Demonstrates a strategic vision and plan in the event new funding comes available

  5. TFS Long Range Facilities Plan • Capital Project Categories • Residential • Dorm • Bungalow • Science • Laboratories • Lecture Hall • Workshop • Site/Support Infrastructure • Garage • Generator Waste Heat Recovery • Road Lift/Realignment

  6. TFS Long Range Facilities Plan • Capital Project Approach • Residential • Dorm New Construction • Bungalow New Construction • Science • Laboratories New Construction • Lecture Hall • Workshop • Site/Support Infrastructure • Garage New Construction • Generator Waste Heat Recovery New Construction • Road Lift/RealignmentNew Construction

  7. TFS Long Range Facilities Plan • Capital Project Approach • Residential • Dorm New Construction • Bungalow New Construction • Science • Laboratories New Construction • Lecture Hall Repurposed Facilities • Workshop Repurposed Facilities • Site/Support Infrastructure • Garage New Construction • Generator Waste Heat Recovery New Construction • Road Lift/RealignmentNew Construction

  8. TFS Long Range Facilities Plan New Repurposed Science Wrkshp

  9. TFS Long Range Facilities Plan Initial Capital Projects • Dorm A • Two-story. Two wings. 24 rooms per wing. Total of 48 rooms. Two bed spaces per room = 96 potential bed spaces. Year-round capable • Central common areas (core) on both floors • Garage • 3-bay. 2300 ft2. Year-round. • Lab • Requirements still to be defined • Waste Heat Recovery • Generator waste heat used for Garage heating

  10. TFS Long Range Facilities Plan Dorm

  11. TFS Long Range Facilities Plan Garage

  12. TFS Long Range Facilities Plan Bungalow

  13. TFS Long Range Facilities Plan Initial Capital Project Timeline Design Site Prep Bungalow Construction Design Construction Design Site Prep Lab 8 Construction Design Complete Construction