NeuLAND detector of the R 3 B collaboration

This presentation discusses the technical design and goals of NeuLAND, a new large-area neutron detector for kinematically complete measurements of reactions with relativistic radioactive beams available at FAIR. The design features high resolution, large acceptance, and multi-neutron detection capability. The presentation also includes information about the prototype test, construction progress, and future plans.

tbanks
Download Presentation

NeuLAND detector of the R 3 B collaboration

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NeuLAND detector of the R3B collaboration Igor Gašparić TU Darmstadt/IRB Zagreb AsyEOS workshop, 6.9.2012, Siracusa, Italy

  2. R3B experimental setup • NeuLAND – New Large-Area Neutron Detector • kinematically complete measurements of reactions with relativistic radioactive beams available at FAIR • Pygmy dipole resonances, neutron/proton flow, nuclei beyond the neutron dripline, … AsyEOS workshop, 6.9.2012, Siracusa, Italy

  3. LAND – Large-Area Neutron Detector • used for >20 years • 200 paddles 200x10x10 cm3 of plastic scintillator and passive iron converter • 10 planes x 20 paddles • σt = 250 ps • σx,y,z = 3 cm • efficiency ~95% for energies > 400 MeV AsyEOS workshop, 6.9.2012, Siracusa, Italy

  4. NeuLAND design goals • σt ≤ 150 ps • σx,y,z ≤ 1.5 cm • one-neutron efficiency ~95% for energies 200-1000 MeV • large acceptance (magnet gap ±80 mrad) • multi-neutron detection capability AsyEOS workshop, 6.9.2012, Siracusa, Italy

  5. NeuLAND technical design • finalized in Oct 2011, TDR submitted • total volume 2.5x2.5x3 m3 • 3000 modules (plastic scintilator bars) 250x5x5 cm3 • each bar readout by two PMT • 30 double planes with 100 bars each, bars in neighboring planes mutually perpendicular large acceptance high resolution AsyEOS workshop, 6.9.2012, Siracusa, Italy

  6. NeuLAND time resolution • 500 MeV protons and 31 MeV electron tests • different prototype bars tested (length, cross section, PMTs) • light guide optimized σt = 125 ps AsyEOS workshop, 6.9.2012, Siracusa, Italy

  7. Erel resolution • 132Sn at 600 AMeV • realistic time resolution introduced • resolution of 20 keV for the Erel = 100 keV and long distance available in the future R3B cave AsyEOS workshop, 6.9.2012, Siracusa, Italy

  8. Multi-neutron recognition • simulations (R3BRoot/Geant3) AsyEOS workshop, 6.9.2012, Siracusa, Italy

  9. Readout electronics Tacquila • system containing discriminator, TDC and QDC • developed for FOPI • adjusted for LAND • used in several experiments (AsyEOS in 2011) • 15 ps internal time resolution • during the S412 experiment in May worked properly • ready for the NeuLAND prototype test in Oct 600 MeV 124Sn on CD2 target (781 mg/cm2) ToF (ns) energy (a.u.) AsyEOS workshop, 6.9.2012, Siracusa, Italy

  10. NeuLAND prototype • 200 bars in 2.5x0.5x1 m3 box • all bars vertical to avoid charged particles (next slide) • calibration with cosmics needs some crossing bars • construction in progress … • delivery of the remaining bars in progress … • test with cosmics in progress … AsyEOS workshop, 6.9.2012, Siracusa, Italy

  11. Test experiment Oct/Nov 2012 • deuteron beam on CH2 target at 200, 400, 600, 800, 1050, 1500 AMeV • (p,2p) reaction, protons detected in Crystal Ball and Silicon Strip Detectors - Δφ≈180, Δθ ≈80 • NeuLAND and LAND efficiencies as a function of energy, time resolution, cross-check of the simulations • MRPCs time resolution and efficiency AsyEOS workshop, 6.9.2012, Siracusa, Italy

  12. Summary • technical design of the new neutron detector finalized (TDR submitted in Nov 2011) • according to the performed tests and simulations detector fulfills requirements of the R3B physics program • test with the 200-bar prototype in Oct/Nov 2012 • construction of the NeuLAND starts in 2013 • 20% demonstrator ready for tests and first experiment in Cave C in 2014 AsyEOS workshop, 6.9.2012, Siracusa, Italy

  13. NeuLAND working group Convener: Konstanze Boretzky, GSI Darmstadt, Germany Deputy: Ushasi Datta Pramanik, SINP Kolkata, India Germany GSI Darmstadt: D. Bertini, K. Boretzky, J. Hehner, M. Heil, G. Ickert, Y. Leifels, D. Rossi, H. Simon HZDR Dresden-Rossendorf: D. Bemmerer, T. Cowan, Z. Elekes, M. Kempe, M. Sobiella, D. Stach, A. Wagner, J. Wustenfeld, D. Yakorev TU Darmstadt: T. Aumann, C. Caesar, D. Gonzalez Diaz, A. Ignatov, D. Kresan, H. Scheit TU Dresden: T. Cowan, M. Roder, K. Zuber U Cologne: J. Endres, A. Hennig, V. Maroussov, A. Zilges U Frankfurt: R. Reifarth, M. Volknandt India SINP Kolkata: B. Agrawal, P. Basu, P. Bhattacharya, S. Bhattacharya, S. Chakraborty, S. Chatterjee, U. Datta Pramanik, P. Kumar Das, J. Panja, A. Rahaman, J. Ray, T. Sinha Portugal LIP Coimbra: A. Blanco, P. Fonte, L. Lopez U Lisbon: D. Galaviz Redondo, J. Machado, P. Teubig Romania ISS Bucharest: M. Cherciu, M. Ciobanu, M. Haiduc, M. Potlog, E. Stan Russia Kurchatov Institute Moscow: L. Chulkov PNPI St. Petersburg: G.D. Alkhazov, V.A. Andreev, A.A. Fetisov, V.L. Golovtsov, E.A. Ivanov, A.G. Krivshich, L.N. Uvarov, V.V. Vikhrov, S.S. Volkov, A.A. Zhdanov Sweden Chalmers Univ. of Technology: A. Heinz AsyEOS workshop, 6.9.2012, Siracusa, Italy