90 likes | 307 Views
IT Cost Control Pertemuan 19-20. Matakuliah : A0304 - Evaluasi Efektivitas Sistem Informasi Tahun : 2006. Direct Project Cost. Environmental operating costs Hardware cost Software cost Installation and configuration cost Overhead Training cost Maintenance cost. Indirect human cost.
E N D
IT Cost Control Pertemuan 19-20 Matakuliah : A0304 - Evaluasi Efektivitas Sistem Informasi Tahun : 2006
Direct Project Cost • Environmental operating costs • Hardware cost • Software cost • Installation and configuration cost • Overhead • Training cost • Maintenance cost
Indirect human cost • Administration, Fringe, G&A, Sr. Management. Etc. • These are usually outside of your control, however, items to look for in budget roll ups include; • Purchasing Labor Charge backs • Hiring Cost Charge Backs • G&A Changes
Situational Audit • What is the organization actually doing with its IT? • Why is the organization doing these things? • How is the organization utilizing the components of its IT resources?
IS Strategic Plan • What next does the organization want to do with its IT? • Why does it want to do this? • How does the organization want to implement these plans?
Methods for cost improvement • Systems may be wholly or in part outsourced • Systems may be wholly or in part downsized or right sized • IT may be harvested