1 / 9

IT Cost Control Pertemuan 19-20

IT Cost Control Pertemuan 19-20. Matakuliah : A0304 - Evaluasi Efektivitas Sistem Informasi Tahun : 2006. Direct Project Cost. Environmental operating costs Hardware cost Software cost Installation and configuration cost Overhead Training cost Maintenance cost. Indirect human cost.

teal
Download Presentation

IT Cost Control Pertemuan 19-20

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. IT Cost Control Pertemuan 19-20 Matakuliah : A0304 - Evaluasi Efektivitas Sistem Informasi Tahun : 2006

  2. Direct Project Cost • Environmental operating costs • Hardware cost • Software cost • Installation and configuration cost • Overhead • Training cost • Maintenance cost

  3. Indirect human cost • Administration, Fringe, G&A, Sr. Management. Etc. • These are usually outside of your control, however, items to look for in budget roll ups include; • Purchasing Labor Charge backs • Hiring Cost Charge Backs • G&A Changes

  4. Indirect organizational cost

  5. IS Department Budget

  6. Situational Audit • What is the organization actually doing with its IT? • Why is the organization doing these things? • How is the organization utilizing the components of its IT resources?

  7. IS Strategic Plan • What next does the organization want to do with its IT? • Why does it want to do this? • How does the organization want to implement these plans?

  8. Methods for cost improvement • Systems may be wholly or in part outsourced • Systems may be wholly or in part downsized or right sized • IT may be harvested

  9. Strategic Matrix