An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Status of Cryogenic control infrastructure at IP8

  2. Refrigerators Architecture CCC OWS Data server(s) OWS Local Cryogenic control room Premium PCU Quantum PCU EWS Profibus network Premium Field interface Premium Field interface Profibus network Accelerator Full Premium Solution Accelerator Premium Quantum Solution

  3. Final Cryo Production Control system Control room SHC8 EW1 CCC OS3 OS4 OS1 OS2 EW2 SCADA data servers DS1 4.5K 1.8K 4.5K 1.8K Ethernet local connection UTP Bat 2851 LHCCA LHCA LHCCB LHCB Ethernet backbone (IT-CS) SDH8 SH8 SD8 SHM8 SHBB8 QSDN QSCB QSAB QSCCB QSRB QSCCA QSKA QSCA QSAA QSRA QSV Main Dryer Comp 1.8K LN2 Buffer Comp 1.8K Comp 4.5K Main Dryer Cold Box 4.5K UCB 4.5K Comp 4.5K QURA US IP8 QUI Connection Box LCB 4.5K 5200 3em UX85 US85 US IP1(a) US IP7(b) QURCB QURCA 8200 2em CB 1.8K CB 1.8K

  4. IP8 Present Cryo Production Control system Control room SHC8 OS1 CCC DSXP LHCB DS XP LHCC DS XP LHCA DD XP QUI/QSDN OS2 4.5K 1.8K 4.5K 1.8K Ethernet local connection UTP Bat 2851 LHCCA LHCA LHCCB LHCB Ethernet backbone (IT-CS) SDH8 SH8 SD8 SHM8 SHBB8 QSDN QSCB QSAB QSCCB QSRB QSCCA QSCA QSAA QSRA QSKA QSV Main Dryer Comp 1.8K LN2 Buffer Comp 1.8K Comp 4.5K Main Dryer Cold Box 4.5K UCB 4.5K Comp 4.5K QURA US IP8 QUI Connection Box LCB 4.5K 5200 3em UX85 US85 US IP1(a) US IP7(b) QURCB QURCA 8200 2em CB 1.8K CB 1.8K

  5. Status of Hardware for production • 17 PLC installed, 3 PLC missing (OK with cryo planning) • 1 Ethernet Starpoint missing • LOCAL PVSS DS based on XP used for commissioning , • Linux PVSS DS ready (migration foreseen this summer) • All PLC systems & components declared in ABCAM.

  6. Hardware Architecture QRL Central Cobtrol room Dedicated OWS/DS Local Cryogenic control room comms. EWS QuantumPCUs ACR responsibility S7-400 Siemens PROFIBUS DP networks (2) WFIP Networks (4) PROFIBUS PA networks ET200 I/O for QV & sensors ET200 I/O temperature sensors QRL test setup

  7. Status of Hardware for QRL • FIP network installed and tested • Profibus Fiber and Coupler installed but not connected in SHC8 • Profibus coupler for tunnel supplied to ACR • Process control PLC installed • Ethernet installed & IP available in SHR8 & SHC8 • DS for PVSS to be provided by ACR • GW siemens to provided by ACR • Profibus slave installation (see PG presentation)

  8. Hardware Architecture for Sector CCC Central Cryogenic control room Data server(s) CCC OWS OWS Local Cryogenic Control room OWS EWS Field Cryogenic control room Local Cryogenic control room comms. EWS QuantumPCUs S7-400 Siemens PROFIBUS DP networks (3) WFIP Gateways PROFIBUS PA networks WFIP Networks (4) ET200 I/O for QV & sensors S7-400 as gateway

  9. Status of Hardware for Sector • FIP network installed and tested • Profibus Fiber and Coupler installed but not connected in SHC8 • Profibus coupler for tunnel supplied to ACR • Process control PLC installed or ready to be installed • Ethernet installed & IP available in SHR8 & SHC8 • DS for PVSS to be provided (CO) • GW siemens to provided (CO) • Profibus WFIP slave installation (ACR) • Reconnection WFIP after QRL test (ACR) • Installation of repeaters & tests FIP after reconnection (CO) • GW FIP to be installed in July/August by CO • PVSS servers ready

  10. Hardware PB encountered (not only at P8) • ACR slipping planning • Difficulty to obtain installation of Network • Coordination PB between IT-CS And TS-EL and Fiber installation we often have to put people in contact and to follow the Installation process • IT-IS planning seems established only under pressure • TS –EL Organization : One responsible per site you have to re-explain 5 times the same thing. • Cabling to GW racks (uses of fan holes to insert cables) • Double check for FIP networks (only for IP8) • ABCAM interface not finished