An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Cooling and warm-up of the VELO under neon atmosphere • conditions • results (Jan 28  30) • implications VELO Nikhef

  2. Warm cool tests with the backup cooler to investigate the possibility to operate the VELO and PU-detectors, while LHCb beam pipe and VELO are under a neon atmosphere of ≈860 mbar. How do AP (=pbeam) and DP (=pbeam - pdet) behave ??? Recently temperature variations in the pit have generated variations in DP of the order of 3 mbar in 5 hours. Baseline: Vacuum PLC and active neon gas injection system (GIS) guarantee that DP stays within range, i.e. (-5,+2) mbar. However, present GIS is not designed for continuous operation. Data taken on January 30, 2008 VELO Nikhef

  3. Cooldown to 10 oC T [oC] Baseplate heating ON DP [mbar] DDP=4 mbar BPH OFF DDP=3 mbar BPH ON VELO Nikhef

  4. Warmup from 10 oC T [oC] DP [mbar] VELO Nikhef

  5. Via movement of the detector halves it is possible to manipulate DP: • @AP=860 mbar 1 mm/half corresponds to a DDP of 0.6 mbar. • However, to do this some hardware interlocks have to be temporarily • overruled. • Possible procedure: • move detectors such that DP=-3 mbar (safety margin of 2 mbar to • the lower limit of -5 mbar) • cool to 10 oC with baseplate heating ON • DP will become ≈0 mbar (safety margin of 2 mbar to the upper • limit of +2 mbar) • Without an active neon gas injection system cooling of the VELO • to 10 oC implies: • modify certain hardware interlocks • quasi-constant surveillance of DP • if needed, bypass some interlocks and adjust detector position to • bring DP back in range, i.e. (-5,+2) mbar. VELO Nikhef