INTERNATIONAL STANDARD ISOTC67/SC4M 1 st edition 2010 5 - 8

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. INTERNATIONAL STANDARD ISOTC67/SC4M 1 st edition 2010 5 - 8 Petroleum and natural gas industries — Well integrity for the operational phase.

  2. Participating Work groups Well integrity management & handover –      Gary Limb (ConocoPhillips) Lead  –      Simon Spark ( Tullow Oil ) –     Nina Ringoen( Centrica ) –      Joe  Anders ( BP ) / Mike Payne BP > replaces Joe  Define well types & risk based monitoring –      Paul Hopmans ( Shell )  ( Iso standard  Convener ) – Andre Luiz Rocha AlvesPetrobras –      Gavin Mundie ( Centrica ) –      Crawford  Hair ( Chevron - Grant Lintern (Woodside) added Well barriers & annular pressure management –      Hilde Brandanger ( Statoil )  –      Alex Crabtree ( Hess ) lead –      Pier Alberto Magarini (Eni) Well review & test criteria –      Nigel Snow ( Maersk )Lead –      Mike Murrey ( ExxonMobil ) –      Remco  Donders (Total)

  3. Other participants • ISO contacts • 'edykhuis@ziggo.nl'; • 'Ries.Langereis@c-a-m.com‘; Reeve, • Neil TN GSNL-PTE/DTST; • OGP focal point'Alf.Reidar.Johansen@ogp.org.uk'; • Participating companies to review. • Petro China • Adco / Zadco Abu Dahbi; • Petronas Malaysia • Billiton • Petroleum Development Oman • Gazprom • Qatar Petroleum

  4. Referenced standards (So far ) • API 14 A / B / D/ H • API 6 A • API 90 • Norsok D 10 • Iso 17776 Hazard identification • Iso 14224 reliability and maintenance data for equipment • ISO 31000 risk management

  5. ISO standard content • Scope / Definitions /References • Well Integrity Management System • Organizational Structure • Competence • Data Management • Handover • Assessment Well Integrity • Assurance Process • Performance indicators KpI’s • Management of Change • Barrier Principle • Barrier Principle/Philosophy • Barrier Definition (WBE/SCE) • Barrier Schematics • Barrier Performance Matrix • Barrier Reliability/survivability (safety case) • ESD/Related Safety Systems • Risk management • Risk factors and assessment Matrix • Corrosion\ Erosion Management • Conductor\Structural\Reservoir Compaction • Risk Based Maintenance Process • Annulus Pressure Management • Annuli Pressure Monitoring Process • Definition/Calculation of MAASP/ MAWOP • Sustained Pressure Management • Integrity assurance • Closed in/temporary suspended wells • Acceptance criteria / Leak Rates • Integrity Fault Mitigation • Integrity Deviation/Waver Process • Incident/ response planning • Lifecycle management. • Well Review/ Health Check Process • Life Cycle Extension • Abandonment criteria for end of well life

  6. Definition of Well integrity Well integrity process is: • Application of technical , operational and organizational solutions to reduce risk of uncontrolled release of well bore fluids through out the life cycle of a well, to avoid harm to people , environment and assets and the required barriers and assurance task in place to prevent this . • This well integrity standard addresses the operate phase of the well from well construct hand over to abandonment only.

  7. Team 1 topics ( Gary ) • Organisation R&R • Information management • Well hand over • Well design basis • Traceability of SCE materials • People & competence • Procedures • Management of change • KPI’s metric’s • Assessment health check ( system)

  8. Team 2 topics (Paul ) • Risk matrix • Performance standards • Mitigation of faults • Emergency response plan • Deviation process • Reliability process • Condition monitoring all wells that are not abandoned • Corrosion proposal Nigel • Risk based monitoring , inspection & maintenance, • flow wetted and non flow wetted components • Reservoir compaction assurance task and risk

  9. Team 3 topics (Alex) • Barriers • Barrier schematic’s matrix • Safety systems / ESD ‘s • Annular pressure management • Methods of monitoring of annular pressure • Risk acceptance criteria definition • Acceptance criteria table • Mitigating measures

  10. Team 4 topics ( Nigel ) • Well review process • Well review scope • Triggers for Well review • Well review documentation process • Technical health check • End of well life review • Valve testing & barrier verification • Leak rates • Block and bleed • Barrier verification test • Testing methods • Function testing • Interface seal testing • Well head maintenance ( OEM spares definition ) • Annular pressure test • SCV testing

  11. Timeline plan for development of ISOTC67/SC4M standard 1 st edition 2010 5 – 8 Well integrity for the operational phase I Note: 15 th afternoon after SPE start and continue in Grand Palace Noordwijk hotel, continue on Monday Tuesday in Rijswijk, details to follow.