INTERNATIONAL STANDARD ISOTC67/SC4M 1 st edition 2010 5 - 8 Petroleum and natural gas industries — Well integrity for the operational phase. Participating Work groups. Well integrity management & handover – Gary Limb (ConocoPhillips) Lead – Simon Spark ( Tullow Oil )
E N D
INTERNATIONAL STANDARD ISOTC67/SC4M 1 st edition 2010 5 - 8 Petroleum and natural gas industries — Well integrity for the operational phase.
Participating Work groups Well integrity management & handover – Gary Limb (ConocoPhillips) Lead – Simon Spark ( Tullow Oil ) – Nina Ringoen( Centrica ) – Joe Anders ( BP ) / Mike Payne BP > replaces Joe Define well types & risk based monitoring – Paul Hopmans ( Shell ) ( Iso standard Convener ) – Andre Luiz Rocha AlvesPetrobras – Gavin Mundie ( Centrica ) – Crawford Hair ( Chevron - Grant Lintern (Woodside) added Well barriers & annular pressure management – Hilde Brandanger ( Statoil ) – Alex Crabtree ( Hess ) lead – Pier Alberto Magarini (Eni) Well review & test criteria – Nigel Snow ( Maersk )Lead – Mike Murrey ( ExxonMobil ) – Remco Donders (Total)
Other participants • ISO contacts • 'edykhuis@ziggo.nl'; • 'Ries.Langereis@c-a-m.com‘; Reeve, • Neil TN GSNL-PTE/DTST; • OGP focal point'Alf.Reidar.Johansen@ogp.org.uk'; • Participating companies to review. • Petro China • Adco / Zadco Abu Dahbi; • Petronas Malaysia • Billiton • Petroleum Development Oman • Gazprom • Qatar Petroleum
Referenced standards (So far ) • API 14 A / B / D/ H • API 6 A • API 90 • Norsok D 10 • Iso 17776 Hazard identification • Iso 14224 reliability and maintenance data for equipment • ISO 31000 risk management
ISO standard content • Scope / Definitions /References • Well Integrity Management System • Organizational Structure • Competence • Data Management • Handover • Assessment Well Integrity • Assurance Process • Performance indicators KpI’s • Management of Change • Barrier Principle • Barrier Principle/Philosophy • Barrier Definition (WBE/SCE) • Barrier Schematics • Barrier Performance Matrix • Barrier Reliability/survivability (safety case) • ESD/Related Safety Systems • Risk management • Risk factors and assessment Matrix • Corrosion\ Erosion Management • Conductor\Structural\Reservoir Compaction • Risk Based Maintenance Process • Annulus Pressure Management • Annuli Pressure Monitoring Process • Definition/Calculation of MAASP/ MAWOP • Sustained Pressure Management • Integrity assurance • Closed in/temporary suspended wells • Acceptance criteria / Leak Rates • Integrity Fault Mitigation • Integrity Deviation/Waver Process • Incident/ response planning • Lifecycle management. • Well Review/ Health Check Process • Life Cycle Extension • Abandonment criteria for end of well life
Definition of Well integrity Well integrity process is: • Application of technical , operational and organizational solutions to reduce risk of uncontrolled release of well bore fluids through out the life cycle of a well, to avoid harm to people , environment and assets and the required barriers and assurance task in place to prevent this . • This well integrity standard addresses the operate phase of the well from well construct hand over to abandonment only.
Team 1 topics ( Gary ) • Organisation R&R • Information management • Well hand over • Well design basis • Traceability of SCE materials • People & competence • Procedures • Management of change • KPI’s metric’s • Assessment health check ( system)
Team 2 topics (Paul ) • Risk matrix • Performance standards • Mitigation of faults • Emergency response plan • Deviation process • Reliability process • Condition monitoring all wells that are not abandoned • Corrosion proposal Nigel • Risk based monitoring , inspection & maintenance, • flow wetted and non flow wetted components • Reservoir compaction assurance task and risk
Team 3 topics (Alex) • Barriers • Barrier schematic’s matrix • Safety systems / ESD ‘s • Annular pressure management • Methods of monitoring of annular pressure • Risk acceptance criteria definition • Acceptance criteria table • Mitigating measures
Team 4 topics ( Nigel ) • Well review process • Well review scope • Triggers for Well review • Well review documentation process • Technical health check • End of well life review • Valve testing & barrier verification • Leak rates • Block and bleed • Barrier verification test • Testing methods • Function testing • Interface seal testing • Well head maintenance ( OEM spares definition ) • Annular pressure test • SCV testing
Timeline plan for development of ISOTC67/SC4M standard 1 st edition 2010 5 – 8 Well integrity for the operational phase I Note: 15 th afternoon after SPE start and continue in Grand Palace Noordwijk hotel, continue on Monday Tuesday in Rijswijk, details to follow.