790 likes | 1.7k Views
Chiller Plant Control. Tracer Summit Chiller Plant Control. Standard Summit Application Program Flexible to accommodate a variety of plant designs Feature rich supports control strategies Easy to understand user interface. The Value in Chiller Plant Control. Pre-engineered Features.
E N D
Tracer Summit Chiller Plant Control • Standard Summit Application Program • Flexible to accommodate a variety of plant designs • Feature rich supports control strategies • Easy to understand user interface
Pre-engineered Features • Load determination • Capacity matching • Rotation • Chiller setpoint control • Failure recovery • User interface Reliable chilled water flow
Load Determination (when to add or subtract a chiller) • Match plant capacity to building load • Run as few chillers as possible at optimal efficiency Matched Capacity => Reduce Operating Costs
Load Determination • Constant or variable flow systems • Add logic • Based on Supply Temp and Chilled Water Setpoint • Operator editable delay times and deadbands • Subtract logic • Based on Supply/Return Water Temps or Bypass Flow (for large systems) and Chiller Capacities • Operator editable delay times and deadbands • Custom • Adaptable to suit customer specific algorithm requirements Reduce Operating Costs
Add Example Add timer starts Chiller is added 47.5° 2.5° Add temp deadband Add timer reset 45° Add delay time (10 minutes) Chilled water supply temp System supply setpoint Prevents Unnecessary Cycling
Subtract Example (Temperature) Chilled water delta temp 10° Subtract timer starts Chiller is subtracted Design delta temp 6.2° Subtract timer reset Subtract delta temp 0° Subtract delay time (20 minutes) Prevents Unnecessary Cycling
Subtract Example (Flow) Subtract flow threshold Subtract timer starts Chiller is subtracted 1080 GPM 900 GPM Subtract timer reset Chiller design flow capacity Subtract delay time (20 minutes) Reduce Operating Costs
C h i l l e r # 2 C h i l l e r # 1 Plant Layout FlexibilityConstant Flow CW Return Temp CW Supply Temp
C h i l l e r # 2 C h i l l e r # 1 Plant Layout FlexibilityVariable Flow - Decoupled Production Pressure Differential Controller or Transmitter Air Handling Units Bypass Line Distribution Variable-Speed Drive Control Valves
Capacity Matching(turn the right chiller on) • Dependent on chiller plant design • Normal - identical chillers • Base - heat recovery / super efficient • Peak - back up / alternate energy source / inefficient • Swing - match the load ! • Custom - mix & match / nested CPC objects Reduce Operating Costs
Rotation (which chiller leads) • Flexible for System Needs • Selected chiller types (Base / Normal) • Calendar based • Other system inputs • Run time based • Manual operator decision Reliable Chilled Water
Current Limit Setpoint Control • Soft Start • Prevents excess capacity on “warm” starts • Pull down the system smoothly • Unload before start • Ride out flow transients during pump control • Variable flow / multiple pump systems • Low supply water temperatures Reduce Operating Costs
Soft Start Example System chilled water supply temperature Chiller plant enabled in the soft start mode 65° Chiller plant transitions from soft startmode to normal mode 20° Soft start deadband 47.5° 2.5° Add temp deadband System supply setpoint 45° Reduce Operating Costs
Failure Recovery keep chilled water flowing • Follow the standard sequence • Multiple failure inputs • Chiller level • System level • Editable time delays Reliable Chilled Water
Diagnostics and Reports • Standard status reports • Diagnostic reporting and message routing Reduced Maintenance Cost
User Interface • Easy to understand • Textual explanations • Graphical illustrations • Intuitive selections • Pre-engineered Reliable chilled water flow
Take-aways • Standard Application Program • Flexible to accommodate a variety of plant designs • Feature rich supports control strategies • Easy to understand user interface
...your systems company Chiller Plant Control
Plant Optimization The meter is on the building! Reduce Operating Costs
Optimization - the meter is on the building! • Chiller selection • Tower control • Distribution pumping static pressure control • System soft loading • System setpoint selection • Humidity / comfort compensation Reduce Operating Costs
Optimization - Chiller - Tower Control • Low limit • Protect the tower & chiller • Chiller - tower optimization • Real Time Calculations? • Move less air? • Pump less water? Reduce Operating Costs
Chiller - Tower Control what is optimal? 350 300 Chiller kW 250 Tower kW 200 Total kW kW 150 100 50 0 22.5 23 24 24.5 25 25.5 26 26.5 27 27.5 28 28.5 29 29.5 Tower Supply Temp Reduce Operating Costs
Distribution Pumping static pressure control • Normally controlled based on system supply / return pressure difference. • Highest system pressure closest to pumps • Highest system pressure at part load • 2-Way valve control stability • Large chiller plant syndrome (leaky valves) Reduce Operating Costs
Distribution Pumping critical valve pressure control • Critical valve reset • Just like VAV Critical Zone Reset but on the water side • Benefits • Reduced pump energy • Better coil control • Extend pump life • Better acoustics Pressure Differential Controller or Transmitter Air Handling Units Control Valves Reduce Operating Costs
Distribution Pumping critical valve pressure control • Requires fully integrated systems • Execution • Monitor critical AHU valve position • Reset distribution static pressure setpoint • Any valve > 90 % open increase setpoint • All valves < 80 % open decrease setpoint Reduce Operating Costs
How to Determine What’s Best? • Remember the meter is on the building • Consider the life cycle costs • Use a computer simulation for chiller selection and tower system sizing Reduce Operating Costs
Preventive Maintenance • Regular data logging / interpretation • Operator training • Regular maintenance • Scheduled teardown inspections Reduce Maintenance Costs
Preventive Maintenance chiller logging - why? • Condenser water 0.5oC High 1.5 % • Condenser 0.5oC High 1.5 % • Cond approach 1.0oC High 3.0 % • Evap setpoint 0.5oC Low 1.5 % • Evap approach 0.5oC High 1.5 % • Cond pressure 15 kPa High 6.0 % -------- • Total losses 15.0 % Reduce Maintenance Costs
Top Three Considerations in Chiller Plant Control • Reduced Risk • Reliable chilled water flow • Operating cost (energy efficiency) • Reduce maintenance cost
Take Aways • Standard Application Program • Flexible to accommodate a variety of plant designs • Feature rich supports control strategies • Easy to understand user interface
...your systems company Chiller Plant Control
Chiller 5 (480) Peak Chiller 4 (480) Base Chiller 3 (480) Normal 2 Chiller 2 (480) Normal 1 Chiller 1 (320) Swing Capacity MatchingChillers On vs. Load 92% 1760 75% 1440 % Building Load 67% 1280 50% 960 800 40% 480 25% Tons 0% Chiller Stages (1920 Ton load) Reduce Operating Costs