1 / 3

CRaTER Pre-Ship Review (I-PSR) RFA Status Bob Goeke

CRaTER Pre-Ship Review (I-PSR) RFA Status Bob Goeke. January 3-4, 2008. RFAs from PER. PER0001, PER0003 -- Conducted Emissions Testing Workmanship testing of spare unit; agreed to leave open PER0002 -- SOC Linux Updates/Patches Responded to (Bartels -> Ashford)

teresa
Download Presentation

CRaTER Pre-Ship Review (I-PSR) RFA Status Bob Goeke

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CRaTER Pre-Ship Review(I-PSR)RFA StatusBob Goeke January 3-4, 2008

  2. RFAs from PER • PER0001, PER0003 -- Conducted Emissions Testing • Workmanship testing of spare unit; agreed to leave open • PER0002 -- SOC Linux Updates/Patches • Responded to (Bartels -> Ashford) • PER0004 -- Amptek PH300 Failure Mode • Responded to (Goeke -> Huegel) • PER0005 -- Junction Temperature Prediction • Responded to (Goeke -> Baker) • PER0006 -- Success Criteria for Thermal Vacuum Testing • Believed closed (Goeke -> Ashford) • PER0007 -- Thermal Vac/Balance Test Conditions • Responded to (Baker/Cottingham -> Glazer) • PER0008 -- Thermal Model Review • Responded to (Baker/Cottingham -> Cerullo)

More Related