MEP STATUS AS ON 18.10.2013. Horizontal Piping Works of Plumbing in Basement-4 by Sanitech. Collar Works of Ducts of HVAC in Basement-4 by Sterling & Wilson. Drain Connection Work of Plumbing in Basement-4 by Sanitech. Grill Work of Ducts of HVAC completed by Sterling & Wilson in Basememt-3.
E N D
Horizontal Piping Works of Plumbing in Basement-4 by Sanitech
Collar Works of Ducts of HVAC in Basement-4 by Sterling & Wilson
Grill Work of Ducts of HVAC completed by Sterling & Wilson in Basememt-3
Erection of Exhaust Fan fixing works by Sterling & Wilson in Basement-3
Connection of Main Distribution Board(MDB) of Electrical Work by Sterling & Wilson in B-2
Header Lines of HVAC laid by Sterling & Wilson in Basement-1
Coordination work ( HVAC, Plumbing, Fire Fighting) in Basement-1
Cable Tray erected for Electrical work by Sterling & Wilson in Basement-1
Placement of Main Distribution Board(MDB) for Electrical Work in Basement-1
Erection of Risers(B1 to Service Floor) for DG Sets by Sterling & Wilson in Basement-1
Vertical Piping work near ST-4 shaft for Plumbing by Sanitech
Laying of Horizontal Soil & Waste Pipes by Sanitech near ST-3 in Basement-1
Connection of Ducts to AHUs in Lower Ground(LG) Floor for HVAC work by Sterling & Wilson
Laying of Cables & Cable trays for Electrical Work by Sterling & Wilson in Ground Floor
Conduting Work for Electrical by Sterling & Wilson in Ground Level
AC Duct Collar Connections for HVAC by Sterling & Wilson in Ground Floor
Insulation of Fresh Air Duct for HVAC by Sterling & Wilson in Ground
Laying of Branch Pipes & Fixing of Sprinklers by Fireproin Ground Level
CSU Drain Connection Work for HVAC by Sterling & Wilson in Ground floor
Fresh Air Duct Insulation Works for HVAC by Sterling & Wilson in Level-1
Chilled Pipe Insulation works for HVAC by Sterling & Wilson in Level-1
CSU Pipe Insulation work and draine piping work for HVAC by Sterling & Wilson in Level-2
Duct Insulation Work for HVAC by Sterling & Wilson in Level-2
Cable Tray Erection for Electrical Work by Sterling & Wilson in Level-2
ConduitingWorks for Electrical by Sterling & Wilson in Level-3
Cable Tray Erection for Electrical Works by Sterling & Wilson in Level-3
CSU Drain Connection Work for HVAC completed by Sterling & Wilson in Level-3
Erection of Fresh Air Ducting for HVAC by Sterling & Wilson in Level-4
Erection of Branch piping for Fire Fighting works by Firepro in Level-4
Erection of Fresh Air Ducting for HVAC by Sterling & Wilson in Level-5
Placement of Package Units for HVAC Work by Sterling & Wilson in L-5
Laying Branch connection works for Fire Fighting by Firepro in Level -6
Erection of Fresh air Ducting for HVAC by Sterling & Wilson in Level-6
Synthetic Coating of Header Line of Fire Fighting Pipes by Firepro in L-8
Insulation of Chilled Water Pipes for HVAC by Sterling & Wilson in L-8
Cable tray Erection for Electrical Work by Sterling & Wilson in Level-8
Laying of Condenser Pipes for HVAC by Sterling & Wilson in Service Floor
Laying of Soil & Waste Horizontal Pipes by Sanitech in Service Floor