MEP STATUS AS ON 18.10.2013

MEP STATUS AS ON 18.10.2013. Horizontal Piping Works of Plumbing in Basement-4 by Sanitech. Collar Works of Ducts of HVAC in Basement-4 by Sterling & Wilson. Drain Connection Work of Plumbing in Basement-4 by Sanitech. Grill Work of Ducts of HVAC completed by Sterling & Wilson in Basememt-3.

teresa
Download Presentation

MEP STATUS AS ON 18.10.2013

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MEP STATUS AS ON 18.10.2013

  2. Horizontal Piping Works of Plumbing in Basement-4 by Sanitech

  3. Collar Works of Ducts of HVAC in Basement-4 by Sterling & Wilson

  4. Drain Connection Work of Plumbing in Basement-4 by Sanitech

  5. Grill Work of Ducts of HVAC completed by Sterling & Wilson in Basememt-3

  6. Erection of Exhaust Fan fixing works by Sterling & Wilson in Basement-3

  7. Connection of Main Distribution Board(MDB) of Electrical Work by Sterling & Wilson in B-2

  8. Header Lines of HVAC laid by Sterling & Wilson in Basement-1

  9. Water Pipe lines of Plumbing laid by Sanitech in Basement-1

  10. Coordination work ( HVAC, Plumbing, Fire Fighting) in Basement-1

  11. Cable Tray erected for Electrical work by Sterling & Wilson in Basement-1

  12. Bus Ducts Storage for Electrical Work in Basement-1

  13. Placement of Main Distribution Board(MDB) for Electrical Work in Basement-1

  14. Erection of Risers(B1 to Service Floor) for DG Sets by Sterling & Wilson in Basement-1

  15. Vertical Piping work near ST-4 shaft for Plumbing by Sanitech

  16. Fire Fighting Pipes laid by Firepro in Basement-1

  17. Laying of Horizontal Soil & Waste Pipes by Sanitech near ST-3 in Basement-1

  18. Connection of Ducts to AHUs in Lower Ground(LG) Floor for HVAC work by Sterling & Wilson

  19. Laying of Cables & Cable trays for Electrical Work by Sterling & Wilson in Ground Floor

  20. Conduting Work for Electrical by Sterling & Wilson in Ground Level

  21. AC Duct Collar Connections for HVAC by Sterling & Wilson in Ground Floor

  22. Insulation of Fresh Air Duct for HVAC by Sterling & Wilson in Ground

  23. Laying of Branch Pipes & Fixing of Sprinklers by Fireproin Ground Level

  24. CSU Drain Connection Work for HVAC by Sterling & Wilson in Ground floor

  25. Fresh Air Duct Insulation Works for HVAC by Sterling & Wilson in Level-1

  26. Detector Base for Fire Alarm System by Fire Pro in Level-1

  27. Chilled Pipe Insulation works for HVAC by Sterling & Wilson in Level-1

  28. CSU Pipe Insulation work and draine piping work for HVAC by Sterling & Wilson in Level-2

  29. Fixing of Sprinklers by Fire Pro in Level-3

  30. Horizontal Piping Works of Plumbing in Level-2 by Sanitech

  31. Duct Insulation Work for HVAC by Sterling & Wilson in Level-2

  32. Cable Tray Erection for Electrical Work by Sterling & Wilson in Level-2

  33. ConduitingWorks for Electrical by Sterling & Wilson in Level-3

  34. Cable Tray Erection for Electrical Works by Sterling & Wilson in Level-3

  35. CSU Drain Connection Work for HVAC completed by Sterling & Wilson in Level-3

  36. Erection of Fresh Air Ducting for HVAC by Sterling & Wilson in Level-4

  37. Erection of Branch piping for Fire Fighting works by Firepro in Level-4

  38. Erection of Fresh Air Ducting for HVAC by Sterling & Wilson in Level-5

  39. Erection of Fire Fighting Treading Pipes by Firepro in L-5

  40. Placement of Package Units for HVAC Work by Sterling & Wilson in L-5

  41. Laying Branch connection works for Fire Fighting by Firepro in Level -6

  42. Erection of Fresh air Ducting for HVAC by Sterling & Wilson in Level-6

  43. Threading of Fire Fighting Pipes by Firepro in Level-7

  44. Fire Fighting Riser connection works by Firepro in Level-7

  45. Synthetic Coating of Header Line of Fire Fighting Pipes by Firepro in L-8

  46. Insulation of Chilled Water Pipes for HVAC by Sterling & Wilson in L-8

  47. Cable tray Erection for Electrical Work by Sterling & Wilson in Level-8

  48. Laying of Condenser Pipes for HVAC by Sterling & Wilson in Service Floor

  49. Laying of Soil & Waste Horizontal Pipes by Sanitech in Service Floor