70 likes | 97 Views
Workshop in Kampala, July 24-27, 2007 preparing for ISO TC 224 Draft Standards test in Africa, with actions and expected results outlined.
E N D
Regional Workshop to disseminate Water Supply and Sanitation Standards of Service, adapted to LDCsPréparation to the ISO TC 224 Drafts Standards test in Africa. WBI/NWSC WORKSHOPOUGANDA, KAMPALA, JULY, 24th TO 27th 2007
Road Map Ingrid PICARD URBACONSULTING WBI/NWSC Workshop, Kampala
Local road-maps (things to do before the STC of Cotonou in November 07) • Upon returning home, the participants commit to undertake the following actions. WBI/NWSC Workshop, Kampala
Informing • To report on the workshop within their home structure • To contact the national standards committee, if one exists, and to report on the workshop • To identify, in each site, all stakeholders (operators, responsible body, relevant authorities, regulators, consumers, bureau of standards) and to organise an information meeting gathering representatives from all these stakeholders WBI/NWSC Workshop, Kampala
Acting • To select final sites for the test • To form an ISO TC 224 mirror Committee at the national level • To form a National Pilot Committee (NPC) driven by the operator (optional) • To form Local Pilot Committees in each selected site • To prepare a workshop for undertaking Stage 2 of the process for each test site WBI/NWSC Workshop, Kampala
Expected results for the next meeting(AfWA STC – Cotonou, Nov 2007) A feed-back is required from each selected site for the next STC of AfWA that will be held at Cotonou, November 2007. It will be even better if a representative of each test site will attend AfWA STC – Cotonou meeting: • to present the activities underway at each site (and especially the creation of pilot committees) • to contribute to the estimation of necessary resources for stage 2 (total budget estimate plus resources available at the local level). WBI/NWSC Workshop, Kampala
Thanks for your attention! Ingrid Picard picard@hydroconseil.com WBI/NWSC Workshop, Kampala