1 / 22

Processing of the new Infrasound Arrays on the IDC Testbed - Initial Experience

Processing of the new Infrasound Arrays on the IDC Testbed - Initial Experience. Nicolas Brachet Acoustic officer, CTBTO/IDC/SM Preparatory Commission for the Comprehensive Nuclear-Test-Ban Treaty Organization Provisional Technical Secretariat Vienna International Centre P.O.Box 1200

terrence
Download Presentation

Processing of the new Infrasound Arrays on the IDC Testbed - Initial Experience

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Processing of the new Infrasound Arrays on the IDC Testbed - Initial Experience • Nicolas Brachet • Acoustic officer, CTBTO/IDC/SM • Preparatory Commission for the • Comprehensive Nuclear-Test-Ban Treaty Organization • Provisional Technical Secretariat • Vienna International Centre • P.O.Box 1200 • A-1400 Vienna • AUSTRIA • Nicolas.Brachet@ctbto.org • Presented at the Infrasound workshop in Kona, Hawaii • November 2001

  2. Outline of the talk • Data received and processed at the IDC • Infrasound processing at the IDC • Goals and motivations for improvement of the system • Case studies • Problems in the processing of infrasound data at the IDC

  3. Incorporation of new IMS stations in IDC processing • IDC is using two processing pipelines in parallel • Operations: automatic and interactive analysis performed on a daily basis - generates the IDC products for distribution • Testbed: mirror of Operations used as a testing environment (software development, software configuration, integration of new stations in the processing) • In 2001, IDC is processing the data from 6 IMS infra stations • IS07 (Australia): September 2001 (Testbed), October 2001 (Operations) • IS08 (Bolivia): August 2001 (Testbed), November 2001 (approved for ops) • IS10 (Canada): September 2001 (Testbed), October 2001 (Operations) • IS26 (Germany): April 2001 (Testbed), October 2001 (Operations) • IS34 (Mongolia): August 2001 (Testbed) • IS57 (USA): October 2001 (Testbed)

  4. Goals and motivations • Improvement of the know-how in infrasound processing • Need for a better understanding of the signals Establishment of a catalog of reference events A few case studies presented in this talk • Becoming familiar with the latest methods in infrasound processing Assessment of existing tools used at the IDC New developments in infrasound signal processing (in 2001, cooperation with French NDC: PMCC is being tested at the IDC) • Station tuning • Currently at the IDC: standard configuration used for all stations • Need to include station specifics in the processing Assessment of the detection capability for each station

  5. Reference events collected in 2001 at the IDC • Pacific bolide (23 Apr 2001) • Earthquakes in Peru (23 Jun, 26 Jun, 7 Jul 2001) • Eruption of the Etna volcano, Italy (Jul 2001) • Explosion at a chemical factory in Toulouse, France (20 Sep 2001) • Mining activity in Canada (11 Sep 2001)

  6. Case study: Pacific bolide (23-Apr-2001) Validation of PMCC results on a well-studied event

  7. PERU Titicaca lake IS08 Ms=8.2 Ms=6.9 Ms=7.5 Ms=6.8 23-Jun-2001 BOLIVIA 26-Jun-2001 07-Jul-2001 100 km Topography data: USGS DEM & Cornell Andes Project Case study: seismic event in Peru (Jun-Jul 2001) Event detected at a distance of 500km at IS08 (Bolivia)

  8. seismic seismic 1 5 4 3 2 6 Case study: seismic event in Peru - 23 Jun 2001 Results of PMCC analysis

  9. Case study: seismic event in Peru - 23 Jun 2001 (Cont.) • REB events in Peru detected by PMCC at IS08 • Most seismic events with mb>5 detected at IS08 • Phases detected: Seismic waves (P and Rayleigh) for large events • Many infrasound phases arrive earlier than expected (I*)

  10. Case study: seismic event in Peru - 07 Jul 2001 Comparison of results for REB event in Peru (07 Jul 2001) • PMCC produced the same type of results as for June 23 event • Libinfra-PIDC detected only the seismic arrivals • Note: phases identified as Noise by StaPro (cannot be associated to an automatic event)

  11. Case study: seismic event in Peru - 07 Jul 2001 (Cont.) Azimuth variation reflects the geomorphology of the Andes Polar diagram of the infra arrivals 3 1 1’ 2 3 1 1’ 2 infra seismic IS08 3 1 REB Event 1’ Ms=7.5 2 The Andean cordillera behaves like multiple infrasound sources activated by the seismic wave front

  12. Infra-Seismic stations co-located in Canada Mining activities recorded at the Canadian stations: IS10 + ULM Lake Winnipeg 200km ULM IS10 Lake Superior 400km

  13. PMCC analysis at IS10 (Canada)

  14. Identification of the events recorded at IS10 Categorization of station-specific events LOCAL MINES MESABI RANGE (400km SE) 200km NE

  15. Infrasound and meteorology: microbaroms at IS26 (Germany) • Detections with similar characteristics over a long time period • Detections produced by DFX-Libinfra, confirmed by PMCC • No correlation with any microbaroms at Flers (France) • Meteorology data: storm in the North Sea the same day

  16. Problems with data processing at the IDC • Low and irregular number of detections observed for all infrasound stations processed at the IDC • Possible cause of the problems • Software related: algorithm, configuration • Data related • Case of IS26 (Germany)

  17. Problems with data processing at the IDC(Cont.) • Asynchronous Testbed and Operations pipelines • Data is forwarded from ops to Testbed in near real time • Data is organized in time intervals of 30min for infra • Intervals are scheduled for processing when they contain a sufficient amount of data • Problem 1: Intervals are processed in near real time: all data needed may not be available for use at the time it is processed • Problem 2: Interval generation and execution is asynchronously done on ops and Testbed • Consequences for the detection process: • Ops and Testbed may process different data • Ops and Testbed may produce different detections

  18. Testbed : I26DE (processing time interval [16:00 - 16:30] on October 16, 2001) ++ tuxshell 2001-10-16 16:34:10 time=1003248000.000 endtime=1003249800.000 name=I26DE get_infra_processing_interval: Requested processing interval 1003248000.000 to 1003249800.000 get_infra_processing_interval: Computed processing interval 1003247999.983 to 1003249632.033 get_infra_processing_interval: Actual waveform data interval 1003247860.885 to 1003249839.957 -- tuxshell 2001-10-16 16:35:01 time=1003248000.000 endtime=1003249800.000 name=I26DE Operations : I26DE (processing time interval [16:00 - 16:30] on October 16, 2001) ++ tuxshell 2001-10-16 16:34:26 time=1003248000.000 endtime=1003249800.000 name=I26DE get_infra_processing_interval: Requested processing interval 1003248000.000 to 1003249800.000 get_infra_processing_interval: Computed processing interval 1003247999.983 to 1003249712.033 get_infra_processing_interval: Actual waveform data interval 1003247860.885 to 1003249919.957 -- tuxshell 2001-10-16 16:35:20 time=1003248000.000 endtime=1003249800.000 name=I26DE Problems with data processing at the IDC - Example

  19. All channel subframes of a Data Frame will have the same start time and duration to within one sample time unit. […] The nominal time field is set equal to the start time of the earliest channel subframe [...] on an interval multiple of 10 seconds and synchronized to the minute(Format and Protocol for Cont. data CD-1.1). Nominal timestamp of the data frame 1 sample (0.05s) 20 seconds Channel subframe Start_time of subframe 20s shift in wfdisc segments Irregular Data frames (within 1 sample) Problems with data processing at the IDC (Cont.) • Digitizing problems at IS26 causes asynchronous wfdiscs

  20. Problems with data processing at the IDC (Cont.) • The number of detections is lower when Wfdisc segments are asynchronous 4 chans 5 chans Number of synchronous channels: 3 chans 12345 12345 12345 12345 12345 12345

  21. Problems with data processing at the IDC (Cont.) Spectral analysis at IS26 • Presence of multiple peaks on all channels • origins of the peaks? • impact on the processing?

  22. Summary • Infrasound signal analysis is a difficult exercise: collection of reference events is necessary • To increase the experience and knowledge in signal processing and event recognition • Familiarization with the detection capability of IMS stations • First step before starting a comprehensive station tuning • Assessment of the analysis tools: • Existing automatic system (detection/association) • PMCC interactive tool for signal analysis • Problem of low number of detections produced at the IDC • Related to the software • Related to the configuration parameters (tuning) • Related to the data