TEXONO: Status and Plans Nov 2002

TEXONO: Status and Plans Nov 2002. KS Period I Analysis 4514/1224 hours of ON/OFF data Magnetic moment analysis completed (LHB) Electron neutrino flux(completed) + analysis(50%) (XB) Inclusive analysis on anomalous neutrino interactions --discussions so far …… (LST ….)

thale
Download Presentation

TEXONO: Status and Plans Nov 2002

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TEXONO: Status and Plans Nov 2002 KS Period I Analysis 4514/1224 hours of ON/OFF data Magnetic moment analysis completed (LHB) Electron neutrino flux(completed) + analysis(50%) (XB) Inclusive analysis on anomalous neutrino interactions --discussions so far …… (LST ….) Nuclear interaction searches – data preparation (LST …..) KS Period II Preparation 186 kg of CsI(Tl) in place (VS) Improved HPGe with shieldings completed (LJ,…….) Electronics upgrade modules completed (NJ) New DAQ+Trigger being installed (LHB,CKC….) New offline software framework being developed (LDZ,LHB…..) Goals : improved HPGe mn, CsI: SM s(ne) WTK Nov 2002

  2. KS/P1 Analysis • HPGe :exploit the low threshold data • Established Problem: mn and Gn for ne via : ne + e nx + e • Speculative Analysis: ※study ne flux from reactor  due to neutron excitation producing e.g. 51Cr, 55Fe [distinct energy & timing …..]  studymn & Gn for ne ※anomalous Neutrino Interactions in Matter e.g.anomalous energy deposition X (>eV) ne + N  nx + N + X [similar analysis as accelerator nm] ※study possible nuclear transitions e.g.73Ge* decays by 2g’s separated by t1/2=4.6 ms CsI(Tl) :TechnicalRun • Event Reconstruction • Background Studies • Optimize for P2

  3. Kuo Sheng Reactor Neutrino Laboratory Front Gate Front View (cosmic vetos, shieldings, control room …..) Inner Target Volume

  4. KS Expt. : Period I Configuration Period I : June 01 – April 02 (60 days OFF) Shielding & Veto [one side] ULB-HPGe + Anti-Comptons CsI(Tl) Array (46 kg)

  5. KS Expt: Period I Detectors ULB-HPGe [1 kg] CsI(Tl) [46 kg] FADC Readout [16 ch., 20 MHz, 8 bit] Multi-Disks Array [600 Gb]

  6. Selected Photos – Period II Installation – HPGe

  7. Selected Photos – Period II Installation – CsI(Tl) Array

  8. CsI(Tl) Event Reconstruction • Making progress, single module [E,Z] OK (LDZ,….) • Amp=255 pulse reconstruction : algorithms completed, applied to real event (YQ,LDZ….) • Feedback to PMT/threshold optimization (LDZ, LFS….) • R&D Projects • LEPS/SPring8 FADC upgrade completed [40 MHz, 10 bits, 32 channels, +FPGA]; next: integrate to TEXONO system (AS) • Studying “Low Energy HPGe”, 5 g mass, aim 200-300 eV threshold, possible nN coherent scatterings (AS) • Prepare AMS run for K-40 in CsI/liquid scin. measurements in 2003 (CIAE) • Initate project on Sono-Luminescence (AS)

  9. FADC Upgrade for SPring8KS • 40 MHz ; 12 bit ; 32 ch/module @ 9 U VME [ c/f KS FADC : 20 MHz ; 8 bit ; 16 ch/module ] • On-board processing with FPGA • 1000 channels to be used in TPC in LEPS Expt. @ SPring8 by End 2002. TPC for LEPS @ SPring8 Mixed signal FADC Adapter Board • 40 MHz sampling rate. • 10 bits resolution with 2Vp-p dynamic range. • Clock distribution with Phase Lock Loop circuit. • On Board digital signal delay and • Real-Time ZERO-Suppression. • High capacity First In First Out Memory. • Easy to use with high density connector. Prototype Measurements :

  10. Reactor Neutrino Interaction Cross-Sections P2: SM (ne) > 2 MeV P1: MM (ne) 1-100 keV P3+: Coh. (nN) < 1 keV

  11. Publications • CsI(Tl) prototype paper, appears in NIM (LY…) • Dark Matter neutron measurement, appears in PLB (WMZ…) • Magnetic moment results, completed and submit soon to PRL (LHB,……) • Saturated event correction, in prep. for NIM (YQ……) • Low energy PSD, in prep. for NIM (WCS,YQ…) • reactor ne flux & P1 constraints, for PLB or PRL (XB …..) • Collaborators • Li HB : Ph.D. , July 02 [P1 magnet moment analysis] • Chen CP : Associate Prof. at Peking U., Sept 02 • Lin ST : join as grad. student, NTU, Sept 02 • Yue Q : Ph.D., expect Jan 03 [Dark Matter etc…] • Xin B : Ph.D., expect July 03 [reactor ne flux, P1 data] NEED to identify/prepare new students !!