430 likes | 792 Views
LAPORAN REALISASI ANGGARAN DAN STOCK ALKON BKKBN S/D NOVEMBER 2011. RAPAT PENGENDALIAN PROGRAM DAN ANGGARAN. PAGU ANGGARAN BKKBN TA. 2011. Ribuan. PAGU ANGGARAN BKKBN TA. 2011. Ribuan. REALISASI ANGGARAN NASIONAL S/D NOVEMBER 2011. Ribuan.
E N D
LAPORAN REALISASI ANGGARAN DAN STOCK ALKON BKKBN S/D NOVEMBER 2011 RAPAT PENGENDALIAN PROGRAM DAN ANGGARAN
PAGU ANGGARAN BKKBN TA. 2011 Ribuan
PAGU ANGGARAN BKKBN TA. 2011 Ribuan
REALISASI ANGGARAN NASIONAL S/D NOVEMBER 2011 Ribuan RealisasiNasional Rp.2.141.703.284 (84,95 %)
PERBANDINGAN REALISASI ANGGARAN SECARA NASIONAL (RM + RK)S/D NOVEMBER 2010 DAN 2011 Ribuan T.A. 2010 T.A. 2011 RATA-RATA REALISASI 86,64% RATA-RATA REALISASI : 84,95 %
REALISASI ANGGARAN DIPA SECARA NASIONAL– PER PROGRAM S/D NOVEMBER TAHUN 2011 Ribuan
REALISASI ANGGARAN DIPA SECARA NASIONAL– PER BELANJA S/D NOVEMBER TAHUN 2011 Ribuan Catatan : BelanjaPegawaiTransito : Rp. 4.847.676,-
REALISASI ANGGARAN BKKBN PUSAT S/D NOVEMBER 2011 Ribuan RealisasiPusatRp. 1.157.432.893,- (89,00%)
T.A. 2010 PERBANDINGAN REALISASI ANGGARAN DIPA BKKBN PUSAT S/D NOVEMBER 2010 DAN 2011 T.A. 2011 (Rp. 000) (Rp. 000) RATA-RATA REAL : 85,14 % RATA-RATA REAL : 89,00%
REALISASI ANGGARAN BKKBN PUSAT (RM + RK) PER SATKER S/D BULAN NOVEMBER 2011 Ribuan
REALISASI PENGADAAN BARANG/JASA SATUAN KERJA KB-KR S/D DESEMBER 2011
REALISASI PENGADAAN BARANG/JASA SATUAN KERJA KB-KR S/D DESEMBER 2011 Lanjutan....
REALISASI PENGADAAN BARANG/JASA SATUAN KERJA SESTAMA S/D DESEMBER 2011
REALISASI PENGADAAN BARANG/JASA SATUAN KERJA DITVOKKOM S/D DESEMBER 2011
REALISASI ANGGARAN BKKBN PUSAT (RM + RK) PER SATKER S/D OKTOBER 2011 DAN RENCANA PENARIKAN S/D BULAN DESEMBER 2011 Ribuan
REALISASI ANGGARAN BKKBN PUSAT PER BELANJAS/D BULAN NOVEMBER 2011 Ribuan Catatan : BelanjaPegawaiTransito : Rp. 306.126,-
REALISASI ANGGARAN PROVINSI S/D NOVEMBER 2011 Ribuan Realisasi Rata2 ProvinsiRp. 984.270.391,- (80,63%)
RATA-RATA REAL : 88,06% PERBANDINGAN REALISASI ANGGARAN DIPA PERWAKILAN BKKBN PROVINSI S/D NOVEMBER 2010 DAN 2011 T.A. 2010 T.A. 2011 (Rp. 000) (Rp. 000) RATA-RATA REAL : 80,63%
REALISASI ANGGARAN (RM + RK) PROPINSI PER OUTPUT PROGRAM KEPENDUDUKAN DAN KB S/D NOVEMBER 2011 Ribuan
REALISASI ANGGARAN PERWAKILAN BKKBN PROVINSI PER BELANJAS/D BULAN NOVEMBER 2011 Ribuan Catatan : BelanjaPegawaiTransito : Rp. 4.541.550,-
Ribuan REALISASI ANGGARAN (RM+RK) PERWAKILAN BKKBN PROVINSI S/DNOVEMBER 2011 Merah ≤ rata2 Propinsi 80,63 %
Ribuan REALISASI ANGGARAN (RM+RK) PERWAKILAN BKKBN PROVINSI S/D NOVEMBER DAN RENCANA PENARIKAN S/D DESEMBER 2011
REALISASI PERKEMBANGAN PENGADAAN BARANG/JASA PERWAKILAN BKKBN PROVINSI S/D NOVEMBER 2011 NilaiMerah= dibawahrealisasi rata2 Propinsi 85,78 %
REALISASI ANGGARAN ADB-DHS II S/D NOVEMBER 2011 Ribuan
HIBAH DALAM NEGERIPERWAKILAN BKKBN PROVINSI JAWA BARAT Ribuan
Lanjutan.... DISTRIBUSI ALKON OKTOBER - DESEMBER 2011
CAKUPAN LAPORAN EVALUASI ALKONNOVEMBER 2011 CAKUPAN LAPORAN KAB./KOTA
Persediaan Alat / Obat KontrasepsiBulan November 2011(F/V/KB)
RASIO KEMAMPUAN STOCK KONTRASEPSI DI GUDANG PUSAT NOVEMBER 2011
RASIO KEMAMPUAN STOCK KONTRASEPSI DENGAN CAKUPAN LAPORANKAB DAN KOTA 100%BULAN: NOVEMBER2011 Sumber Data *) : F/V/KB di26 Provinsi **) : Berdasarkan PPM dan KKP tahun 2011 di26 Provinsi
RASIO KEMAMPUAN STOCK KONTRASEPSI DENGAN CAKUPAN LAPORAN KAB DAN KOTA >90% s/d <100%BULAN: NOVEMBER2011 Sumber Data *) : F/V/KB di3Provinsi **) : BerdasarkanPPM dan KKP tahun 2011 di 3 Provinsi
RASIO KEMAMPUAN STOCK KONTRASEPSI DENGAN CAKUPAN LAPORAN KAB DAN KOTA <90%BULAN: NOVEMBER 2011 Sumber Data *) : F/V/KB di3Provinsi **) : Berdasarkan PPM dan KKP tahun 2011 di 3Provinsi
RASIO STOK ALKON TK. PROV & KAB YG KURANG DARI 3 BULAN s/d NOVEMBER2011
RASIO STOK ALKON TK. PROV & KAB YG KURANG DARI 3 BULAN s/d NOVEMBER 2011 Biro KeuangandanPengelolaan BMN
RATIO STOK ALKON TK. PROV & KAB YG LEBIH DARI 18 BULAN TAHUN 2011 Biro KeuangandanPengelolaan BMN
RASIO STOK ALKON TK. PROV & KAB YG LEBIH DARI 18 BULAN TAHUN 2011 Biro KeuangandanPengelolaan BMN
RASIO STOK ALKON TK. PROV & KAB YG LEBIH DARI 24 BULAN TAHUN 2011 Biro KeuangandanPengelolaan BMN
RASIO STOK ALKON TK. PROV & KAB YG LEBIH DARI 24 BULAN TAHUN 2011 Biro KeuangandanPengelolaan BMN
PERCEPATAN PELAKSANAAN PROSES LELANG UU NO. 22 TAHUN 2011 APBN 2012 ArahanPresiden RI dalamPenyerahan DIPA 2012 Melaluisuratdari Tim EvaluasidanPengawasan PenyerapanAnggaran No. TEP/S-1/12/2011 Memerintahkan KPA : Pelelanganpaket-paketpengadaanbarangdanjasa paling lambat13 Januari 2012. Hasilpelelanganpaket-paket yang telahdiumumkanberikutpenjelasanuntukpaket yang tidakberhasildiumumkantanggal16 Januari 2012. Menyelesaikanpenandatanganankontrak paling lambattanggal16 Maret 2012. Hasilpelaksanaanpenandatanganankontrakberikutpenjelasanuntukpaket yang tidakberhasilditandatanganitanggal19 Maret 2012.
Terima Kasih Dua anak .... Lebih baik