1 / 7

Emirates Airline Update AGIFORS, Airline Operations Washington May 2004

Emirates Airline Update AGIFORS, Airline Operations Washington May 2004. A Year of Changes. Implemented Avient’s MCS / CORE New Crew Rostering System – AdOpt Avient’s Crew Tracking System Integrating Systems Introduced ULH operations (DXB-SYD) 8 unbudgeted A340-300s. Mission Management.

thor-slater
Download Presentation

Emirates Airline Update AGIFORS, Airline Operations Washington May 2004

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Emirates Airline Update AGIFORS, Airline Operations Washington May 2004

  2. A Year of Changes • Implemented Avient’s MCS / CORE • New Crew Rostering System – AdOpt • Avient’s Crew Tracking System • Integrating Systems • Introduced ULH operations (DXB-SYD) • 8 unbudgeted A340-300s

  3. Mission Management • There is no such thing as an optimal operation or recovery • There is suitability, prioritisation and minimising the impact of disruption – decision support • What keeps or affects aircraft moving? • A complete mission to manage • What happens on the ground? • Pre-empt delays, enable a recovery plan before a delay is a reality

  4. Our Future – Managing Growth • How do we turn the Emirates vision and plan into reality and minimise unit cost? • Challenge the current norms • Difficult when making record profits • “Why change something that is proving to work?” • Been manageable to date, but we are currently mostly reactive • Introduce OR, gain acceptance and aim for a more proactive culture

  5. Our Future – Managing Growth • Airport capacity constraints: • Parallel Runways, too close • Not CAT3 • Construction site • Increasing number of remote stands • Fast approaching problem – A380s

  6. Next Stop – Polar Operations to the US JFK Jun 04 SFO Jan 05

  7. Next Stop – Polar Operations to the US

More Related