What We Have Learned • COCCODE • Maintain current system • Collect annual fee • Skilled Masons • Part time plumber • Elected every two years • Capable and Motivated
Existing System Note: All sectors are fundamentally the same, but only Sector 5 is shown in this diagram Water Area A & B (details not included) 3 Supply Springs ≈2.7 L/s Water Area C
Existing System Note: All sectors are fundamentally the same, but only Sector 5 is shown in this diagram Water Area A & B (details not included) 3 Supply Springs ≈2.7 L/s Water Area C
Existing System Note: All sectors are fundamentally the same, but only Sector 5 is shown in this diagram Water Area A & B (details not included) 3 Supply Springs ≈2.7 L/s Water Area C
Existing System Note: All sectors are fundamentally the same, but only Sector 5 is shown in this diagram Water Area A & B (details not included) 3 Supply Springs ≈2.7 L/s Water Area C
Existing System Note: All sectors are fundamentally the same, but only Sector 5 is shown in this diagram Water Area A & B (details not included) 3 Supply Springs ≈2.7 L/s Water Area C
Existing System Note: All sectors are fundamentally the same, but only Sector 5 is shown in this diagram Water Area A & B (details not included) 3 Supply Springs ≈2.7 L/s Water Area C
Design Assumptions Requirements • All Static Pressure below 80 psi • All Dynamic Pressures greater than 0 psi at peak flow Objectives • Listed in 3.1
Proposed System with Existing System Interactions Water Area A & C (details not included) 1 2 3 connection 4 connection
Proposed System with Existing System Interactions Water Area A & C (details not included) 1 2 3 connection 4 connection
Proposed System with Existing System Interactions Water Area A & C (details not included) 1 2 3 connection 4 connection
Proposed System with Existing System Interactions Water Area A & C (details not included) 1 2 3 connection 4 connection
Proposed System with Existing System Interactions Water Area A & C (details not included) 1 2 3 connection 4 connection
Community Involvement At least 2 skilled masons and plumber on site 10% of material costs Digging of the entire trench for pipeline