120 likes | 237 Views
Off Shore Platform Modularization. Necessity, Not An Option. Necessity?. Consider The Job Site Green Field Brown Field Blue Field. Blue Field Job Site. What Is In An Off Shore Platform?. 7 Decks. 10 Packages Decks. Cellar L Mezzanine Production U Mezzanine Weather Drilling
E N D
Off Shore Platform Modularization Necessity, Not An Option
Necessity? Consider The Job Site • Green Field • Brown Field • Blue Field - 2
What Is In An Off Shore Platform? 7 Decks 10 Packages Decks • Cellar • L Mezzanine • Production • U Mezzanine • Weather • Drilling • Heli Deck Skid Base Drilling PKG Pipe Barn Generator Bldg Living Qtrs • Flare Boom • Stair Tower • Pedestal Crane • Bridge Cap • DSF
Modular Build • By Deck • By Blocks Per Deck • Bottom Up – Literally
Assembly - 7
. Top of A53 Shaft GBS Site – Tower Crane View A51 Cover Deck Installed A54 Shaft, DCL
. LMD PE Pre-Erection Block 33D - Outfitting LMD PE Pre-Erection Block 32B - Outfitting CD Mechanical Installation and Outfitting LMD PE Pre-Erection Block 33E - Outfitting
Modular Installation • GBS • Topsides