An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Off Shore Platform Modularization Necessity, Not An Option

  2. Necessity? Consider The Job Site • Green Field • Brown Field • Blue Field - 2

  3. Blue Field Job Site

  4. What Is In An Off Shore Platform? 7 Decks 10 Packages Decks • Cellar • L Mezzanine • Production • U Mezzanine • Weather • Drilling • Heli Deck Skid Base Drilling PKG Pipe Barn Generator Bldg Living Qtrs • Flare Boom • Stair Tower • Pedestal Crane • Bridge Cap • DSF

  5. Modular Build • By Deck • By Blocks Per Deck • Bottom Up – Literally

  6. Assembly Sequence - 6

  7. Assembly - 7

  8. . Top of A53 Shaft GBS Site – Tower Crane View A51 Cover Deck Installed A54 Shaft, DCL

  9. . LMD PE Pre-Erection Block 33D - Outfitting LMD PE Pre-Erection Block 32B - Outfitting CD Mechanical Installation and Outfitting LMD PE Pre-Erection Block 33E - Outfitting

  10. Modular Installation • GBS • Topsides

  11. Installation

  12. Off Shore Platform Modularization The End