Off Shore Platform Modularization. Necessity, Not An Option. Necessity?. Consider The Job Site Green Field Brown Field Blue Field. Blue Field Job Site. What Is In An Off Shore Platform?. 7 Decks. 10 Packages Decks. Cellar L Mezzanine Production U Mezzanine Weather Drilling
E N D
Off Shore Platform Modularization Necessity, Not An Option
Necessity? Consider The Job Site • Green Field • Brown Field • Blue Field - 2
What Is In An Off Shore Platform? 7 Decks 10 Packages Decks • Cellar • L Mezzanine • Production • U Mezzanine • Weather • Drilling • Heli Deck Skid Base Drilling PKG Pipe Barn Generator Bldg Living Qtrs • Flare Boom • Stair Tower • Pedestal Crane • Bridge Cap • DSF
Modular Build • By Deck • By Blocks Per Deck • Bottom Up – Literally
Assembly - 7
. Top of A53 Shaft GBS Site – Tower Crane View A51 Cover Deck Installed A54 Shaft, DCL
. LMD PE Pre-Erection Block 33D - Outfitting LMD PE Pre-Erection Block 32B - Outfitting CD Mechanical Installation and Outfitting LMD PE Pre-Erection Block 33E - Outfitting
Modular Installation • GBS • Topsides