Accelerator Week in Review

This comprehensive report includes regular 9 am scheduling meetings, crew chief summaries, machine summaries, operational plans, weekly machine reports, operational summaries, and more analytical insights into accelerator operations and performance.

Download Presentation

Accelerator Week in Review

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Accelerator Status Accelerator Week in Review • Part I: Regular 9am SchedulingMeeting • Crew Chief Summary • 24 hour machine summaries and study requests – Machine Coordinators • Operational Plan –Mary Convery • Part II: Weekly Machine Reports • Weekly Operational Summary – Cons Gattuso • User, Pbar and Tevatron weekly operational plots • Collider shot summary • NuMI beam summary • MiniBooNE beam summary • Weekly Machine Summaries – Machine Coordinators

  2. Accelerator Status T979 Ultrafast Timing

  3. Accelerator Status

  4. Accelerator Status T:RF2 trip

  5. Accelerator Status Integrated Luminosity Key Store # Available Pbars Initial Luminosity Avg Delivered Lum Store Duration Store End Store 8728 375 E10 361 E30 6919 nb-1 11.1 hrs Planned Average Delivered Luminosity 60.948 pb-1 (0700 Friday to 0700 Friday) Store 8725 365 E10 3332 E30 7912 nb-1 15.6 hrs Planned Store 8733 117E10 123 E30 On Going Store 8721 395 E10 356 E30 8306 nb-1 14.6 hrs Planned Store 8717 405 E10 415 E30 10263 nb-1 21.8 hrs Planned Store 8720 356 E10 300 E30 8087 nb-1 17.4 hrs Planned Store 8719 408 E10 373 E30 9497 nb-1 17.1 hrs Planned Delivered Luminosity [1/pb] Store 8718 364 E10 327 E30 8824 nb-1 19 hrs Planned D0/CDF access D0/CDF access F2 wet engine repair D0/CDF access CDF Luminosity read back issue I:QF12 access into F-Sector and the rest of the Ring Tevatron EOS studies 5th 5

  6. Accelerator Status

  7. Accelerator Status

  8. Accelerator Status

  9. Accelerator Status

  10. Accelerator Status

  11. B21 spool piece replacement Kautz Rd shutdown D16-2 dipole replacement PAK3 abort kicker repairs Accelerator Status 11

  12. Accelerator Status

  13. Accelerator Status

  14. Accelerator Status Integrated luminosity potential of a store FY09

  15. Accelerator Status Weekly integrated luminosity and store hours per week red line goal ~53 pb-1/wk Weekly integrated luminosity (pb-1) May June July Aug Sept Oct Nov Dec Jan Feb Mar Apr May Store hours per week May June July Aug Sept Oct Nov Dec Jan Feb Mar Apr May

  16. Accelerator Status

  17. Accelerator Status