1 / 23

McHenry

Illinois Department of Transportation Division of Highways – Region One. HACIA NETWORKING EVENT November 14, 2013. McHenry. Lake. 1. Kane. DuPage. Jose Rios, P.E. Engineer of Program Development. Cook. Will. Engineering Funding Levels. Dollars (Million). Engineering New Starts.

tirzah
Download Presentation

McHenry

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Illinois Department of Transportation Division of Highways – Region One HACIA NETWORKING EVENT November 14, 2013 McHenry Lake 1 Kane DuPage Jose Rios, P.E. Engineer of Program Development Cook Will

  2. Engineering Funding Levels Dollars (Million)

  3. Engineering New Starts Dollars (million)

  4. Engineering Opportunities The District’s anticipated FY 2014 Engineering Program is $150 million This includes both ongoing and new engineering And the new starts are…

  5. Phase II Engineering • US 12 • Rand Road at IL 59 • I-290 • Over Salt Creek • IL 47 • Main Street south of Elburn • Various Traffic Signal Design • Various Plan Preparation • Various SCAT Design • Various Structures Plan Preparation

  6. Phase I Engineering • Various Project Studies • 5 Contracts

  7. Major Ongoing Studies • Circle Interchange • Illiana Corridor • Interstate Route 55 to Interstate Route 65 • Interstate Route 290 (Eisenhower Expressway) • Mannheim Road to Austin Avenue • Interstate 55 Managed Lane • I-355 to I-90/94

  8. Circle Interchange

  9. Circle Interchange Total Project Cost = $420 million over 4 years • Individual contracts in FY 2014 and FY 2015 include… • 60X27 West Harrison St. & Halsted St. Bridge • (Watermain Procurement) Awarded 10/11/2013 • 60W25 Morgan St. over I-290 Awarded 8/22/2013 • 60W26 Harrison St. over I-90/94(W) and Halsted St. • 60W29 Peoria St. over I-290 • 60W36 Tunnel Bulkheading and Watermain –Award 9/10/2013 • 60W71 Harrison Street over I-90/94 (E) • 60W28 NW Flyover • 60W30 Taylor St over I-90/94 • 60W31 Congress Parkway/I-290 Bridges /Mainline I • 60W33 I-90/94 Mainline & Adams, Jackson/Van Buren • 60W32 Congress Parkway/I-290 Bridges /Mainline II • Additional contracts also being developed.

  10. Circle Interchange Halsted Street (looking south)

  11. Circle Interchange Peoria Street (looking south)

  12. Illiana Corridor • B3 Corridor selected as preferred corridor • 47-mile access – controlled expressway

  13. Illiana Corridor Benefits • Economic Opportunity • $1.4 billion in construction related short-term opportunities, • $4 billion in long-term opportunities • CMAP estimates the project would increase the Gross Regional Product (GRP) by $425 million • Provide a continuous high speed freight corridor between • Illinois and Indiana • $5 billion in travel time saving over 75 years • Improve access to the proposed South Suburban Airport and to • Gary-Chicago Regional Airport • Improve accessibility to one of the largest intermodal freight • areas in America

  14. Illiana Corridor Project Milestones • Project Milestones • November 8, 2013: IDOT released Request for Qualifications (RFQ) for potential P3 concessionaire teams • December 4, 2013: IDOT/INDOT will host DBE and Industry Outreach Event • December 19, 2013: Deadline to respond to RFQ • Spring 2014: Publish Final EIS and receive Record of Decision (ROD) from the FHWA • Spring 2014: IDOT to release Request for Proposals (RFP) • Fall 2014: Award contract and begin negotiations • Fall 2015-2018: Project construction

  15. DBE and Industry Outreach Event • December 4, 2013 • Holiday Inn Hotel and Conference Center • 411 South Larkin Avenue, Joliet, IL • Learn more about Illiana Corridor project and current P3 schedule • Learn about the IDOT DBE program and workforce training programs • Network with potential project proposers

  16. Interstate Route 290 Project Schedule • IDOT partnering with CTA – Blue Line Vision Study • Four Alternatives Carried Forward • Additional Lane – Mannheim to Austin • Improved Interchanges • Potential Managed lanes and/or Tolling • CTA Blue Line Extension to Mannheim (Bus or Rail) • Supporting Bus Service • Study completion – Late 2014

  17. Interstate Route 290 Harlem Ave

  18. Interstate Route 290 Austin Ave

  19. Interstate 55 Managed Lanes

  20. Interstate 55 Managed Lanes Managed Lanes Controls traffic movement • Number of vehicle occupants • Limit entry and exit points • Fixed or variable tolling Improves traffic flow through • Increased vehicle occupancies • Support of transit ridership • High Occupancy Vehicle (HOV) • Lanes dedicated to HOV • Bus access • Vehicle occupancy criteria • High Occupancy Toll (HOT) Lane • Separate tolled lane • HOV’s Ride for Free • Single occupancy vehicles (SOV) • pay toll • Express Toll Lane (ETL) • Separate tolled lane for all • passenger vehicles and buses • Fixed or Variable Pricing • HOVs may pay reduced tolls

  21. Interstate 55 Managed Lanes • Public Meeting held November 1, 2012 • Document findings of environmental studies • Completion of study currently estimated by 2015

  22. Mentor Protégé Program

  23. Thank you

More Related