1 / 6

On-going work

Future simplifications for General Aviation Juan Anton Continuing Airworthiness Manager Rulemaking Directorate EASA. On-going work. Task MDM.048 “CS for standard changes and repairs” (similar to AC43-13) ToR published on 28 July 2011.

tiva
Download Presentation

On-going work

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Future simplifications for General Aviation Juan AntonContinuing Airworthiness ManagerRulemaking DirectorateEASA

  2. On-going work Task MDM.048 “CS for standard changes and repairs” (similar to AC43-13) ToR published on 28 July 2011. Applicable to aeroplanes up to 5700 Kg MTOM, rotorcraft up to 3175 Kg MTOM, sailplanes , balloons and airships. Agency task. It is linked to the changes introduced in Regulation (EU) 748/2012 in relation to Standard Changes and Repairs. NPA expected 2nd Quarter 2013.

  3. On-going work Task MDM.038 “Guidance on TBO limits” NPA2011-15 published on 16 September 2011 (3 month consultation). Covers all type of components installed on non-powered and piston engine aircraft other than complex motor-powered aircraft, when not used for Commercial Air Transport. Very detailed guidance on the inspection procedure to extend the TBO of a piston engine.

  4. On-going work Task M.027 “Guidance for Aircraft Continuing Airworthiness Monitoring (ACAM)” Opinion expected 1st Quarter 2013. This task mostly affects NAAs.

  5. On-going work Part-M General Aviation Task Force NPA2012-17 published on 29 October 2012 (3 month consultation).

  6. On-going work B2L and L licence NPA2012-15 published on 04 October 2012 (3 month consultation).

More Related