1 / 2

On-Going Developments

On-Going Developments. Development of a Computerised Bridge Management System for Wales – Pilot for demonstration Welsh Assembly Government October 2004 Key Performance Indicators Highways Agency and CSS October/November 2004 Asset Valuation Model for Highway Structures Highways Agency

kisha
Download Presentation

On-Going Developments

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. On-Going Developments • Development of a Computerised Bridge Management System for Wales – Pilot for demonstration • Welsh Assembly Government • October 2004 • Key Performance Indicators • Highways Agency and CSS • October/November 2004 • Asset Valuation Model for Highway Structures • Highways Agency • November 2004

  2. On-Going Developments • Code of Practice for the Management of Highway Structures and Framework for a BMS • DfT and Bridges Board • First Draft to Steering Group on 1st November • March/April 2005 • Condition/Funding Projection Model • LoBEG and TfL • March 2005

More Related