An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PSSRA Work Package Overview “The Mighty War Ship” USS JOHN C. STENNIS (CVN 74) FY13 DPIA

  2. What’s the Message? • NW Contractors supporting the war-fighter and Naval SY. • Opportunity - good sized work package for prime contractor, sub-contractor and vendor partners. • Contractor Work Force engaged. • Opportunity for another Private Sector “Win”!

  3. Terminology • MSMO- Multi-Ship Multi-Option = Vigor Shipyard • HM&E Repairs and Modernization (Shipalts) • IDIQ – Indefinite Delivery Indefinite Quantity = International Marine and Industrial Applicators, LLC (IMIA) • Preservation of Underwater Body, Freeboard, Catwalks, Tanks • Project Manager = Assistant Project Superintendent • SBS – Ship Building Specialist = Zone Manager • Contracting Officers Technical Representative • ACO – Administrative Contracting Officer • Warrant Holder

  4. Overview • Estimated Total Man-days (MD’s) 61K • MSMO Repair 29K • IDIQ Preservation 32K • MSMO = Code 412 and Vigor Shipyards Inc. • HM&E Repairs & SCD/Alterations • IDIQ = Code 412 and IMIA • Hull, Tank, Vent Plenum Preservation • 4A1 Upkeep will start 2 June 2014 – landing area non-skid preservation, Boat Davit & B&A Crane weight tests

  5. MSMO Major Repair Items • 2 Firemain Piping Repairs • 2 Weather Deck Drain Pipe Repairs • 2 Catapult Hydraulic Piping Repairs (NR 1 & 3) • 2 CAT Wing Void Piping Repairs • Replace FWD CHT Tank Diffuser Nozzle • Replace CHT System Cross Connect Valve • Modify Trash Compactor Cover • Replace Bridge Windows 08 Level • Replace Vent Inlet Screen 01-203-2 • Replace Fire Zone Boundary Door 03-148-6 • Weight Test 4 Ea Bi-Rail Bridge Cranes • Replace 2 Metal Joiner Doors • Replace Corroded Vent Heater • Lagging at Various Locations • Replace 148 SW Hoses in Weapons Magazines • AC #10 Motor/Pump Transition Replacement • Stern Dock Rubber Removals – Preservation • Replace all Fire Pump Recirc Piping • 12 Watertight Door Replacements • 6 AESS Trunk Repairs • 4 Fan Coil Unit Replacements • 13 Ventilation Ducting Repairs • 2 Catapult Drain Piping Repairs • JBD 3 Inaccessible Void Repairs • 4 CHT Piping Repairs • Replace Laminate in Wardrooms/CPO Mess • 15 Head Rehab • Hydro-blast 5 CHT Zones • Weight Test CIWS Safety Nets • Replace Fantail Portable Life-rails • Deck repair in Forward Galley • SPS-48 Radar Heat Exchanger Cleaning • Chill Water Piping Insulation • 48 Radar Heat Exchangers Cleaning • Stern Dock Bumper Repairs

  6. MSMO Major Modernization Work NAVSEA - None screened TYCOM - • SCD 4502 ACE HP ACCUMULATOR GATE VALVE MOD • SCD 4757 REMOVAL OF FORWARD BOAT BOOMS • SCD 5687 UPGRADE GALLEY VENT CONTROL CABINET 2-169-0-Q • SCD 5857 AFFF SPRINKLING FOR ENCLOSED AIRCRAFT FUELING STATION (S/A 9391D) • SCD 5875 CAT LO SERVICE TANK MODS • SCD 6363 STEERING GEAR HYDRAULIC FILTER MOD • SCD 6486.1 SAFETY IMPROVEMENTS TO TRUNK SAFETY NETS (5 Weapons Spaces) • SCD 6486.2 SAFETY IMPROVEMENTS TO TRUNK SAFETY NETS (1&4 Shaft Alley Trunks) • SCD 7030 WEATHER OPENING DISPOSABLE FILTERS • SCD 7131 UPGRADE GALLEY VENT CONTROL CABINET 03-160-3-Q • SCD 9073 MEDICAL STERILIZER • S/A 9442 CAG/DCAG OFFICE EQOL – • Replace Galley Ovens in Aft Crews Galley (EQOL Alteration)

  7. IDIQ Preservation Overview

  8. IDIQ Preservation Overview

  9. IDIQ Preservation Overview

  10. Suddenly, a heated exchange took place between the king and the moat contractor… Contracting Humor…..