130 likes | 277 Views
A Visual Approach to LSAR Project Management. Insert phot o here. Crop to maintain shape and size of photo box. . OmegaPS and Analyzer North American User Group Meeting November 12-13, 2013. Anmarie Flamingo LSA Software Administrator. Agenda. About Oshkosh Defense
E N D
A Visual Approach to LSAR Project Management Insert photo here. Crop to maintain shape and size of photo box. OmegaPS and Analyzer North American User Group Meeting November 12-13, 2013 Anmarie Flamingo LSA Software Administrator
Agenda • About Oshkosh Defense • Are we ahead or behind? • Production line example • Define our production line • Using visual models • Demonstration • Questions
About Oshkosh Defense Heavy Equipment Transporter (HET) Palletized Load System (PLS) Logistics Vehicle System Replacement (LVSR) Heavy Expanded Mobility Tactical Truck (HEMTT) Heavy Family of Medium Tactical Vehicles (FMTV) Medium Tactical Vehicle Replacement (MTVR) MRAP All-Terrain Vehicle (M-ATV) Base Variant M-ATV Special Forces Variant Medium& MRAP Light Combat Tactical All-Terrain Vehicle (L-ATV) HMMWV Modernization Solutions Special Purpose All-Terrain Vehicle (S-ATV) SandCat Tactical Protector Vehicle (TPV) Light
Logistics Product Data Collection • Several users create data at one time • Data is often “hidden” in database software • Data is not made visual until a report or technical manual is published LSA-019 Technical Manual LSAR • Are we ahead or behind?
Production Line Example • Station 1 • Station 2 • Station 3 • Station 4
Define the steps XB XB XH HA BF CA BA HA BF BH HB HG BA CB BD HD BI CD BK • Parts • Structure • Reliability • FMEA & RCM • Task Analysis • LORA
OmegaPS Progress Manager • Track LSA Activities in an OmegaPS Project by Candidate Item • Actions were used as the assembly line • Progress marks were used as the stations • Are we ahead or behind?
ODBC Linking LSAR ODBC Link
Questions? Anmarie Flamingo LSA Software Administrator 920-235-9151 x26369 aflamingo@defense.oshkoshcorp.com oshkoshdefense.com