90 likes | 233 Views
P802.11ac Report to EC on Conditional Approval to forward draft to RevCom. Date: 2013-09-16. Authors:. Introduction. This document contains the report to the IEEE 802 Executive Committee in support of a request for conditional approval to send IEEE P802.11ac Draft x.0 to Revcom .
E N D
P802.11ac Report to EC on Conditional Approval to forward draft to RevCom Date: 2013-09-16 Authors: Osama Aboul-Magd (Huawei Technologies)
Introduction • This document contains the report to the IEEE 802 Executive Committee in support of a request for conditional approval to send IEEE P802.11ac Draft x.0 to Revcom. Osama Aboul-Magd (Huawei Technologies)
Sponsor Ballot Results – P802.11ac Osama Aboul-Magd (Huawei Technologies)
802.11 WG Letter Ballot Comments – P802.11ac Osama Aboul-Magd (Huawei Technologies)
Unsatisfied Technical comments by commenter *Assumed unsatisfied, no response to emails to commenter Osama Aboul-Magd (Huawei Technologies)
Unsatisfied Editorial comments by commenter Osama Aboul-Magd (Huawei Technologies)
Unsatisfied comments • The composite of all unsatisfied comments and the resolutions approved by the comment resolution committee received during working group ballot may be found in the embedded document on the right: • Double click on the icon to the right to open this. • A copy of this same data presented using MyBallot access database report format is attached. • Double click on the icon to the right to open this. Osama Aboul-Magd (Huawei Technologies)
Mandatory Coordination Osama Aboul-Magd (Huawei Technologies)
TGac Timeline * The revised RevCom submission will be submitted 25 days prior to the SB meeting, according to RevCom policy section 6 Osama Aboul-Magd (Huawei Technologies)