100 likes | 240 Views
Introduction to LTBP’s Achievements. By Dr Kelly West Scientific Liaison Officer, LTBP. Establishing Project Infrastructure:. to provide the riparian stations with the necessary infrastructure and equipment to conduct technical studies and monitor the state of Lake Tanganyika.
E N D
Introduction to LTBP’s Achievements By Dr Kelly West Scientific Liaison Officer, LTBP
Establishing Project Infrastructure: to provide the riparian stations with the necessary infrastructure and equipment to conduct technical studies and monitor the state of Lake Tanganyika
Kigoma Station,Tanzania Office space and dry laboratory facilities at TAFIRI
Mpulungu Station, Zambia the R/V Silver Shoal and limnological laboratory at Department of Fisheries
Bujumbura Station, Burundi The Bujumbura Office at Dept. of Waters and Fisheries
Uvira Station, DR Congo The Center for Hydrobiological Research in 1950 and today
Uvira Station, DR Congo the courtyard and aquarium room of CRH
Uvira Station, DR Congo the limnology laboratory and collections room at CRH
All Stations All Stations: Radio and email links Computers Vehicles Inflatable and fiberglass boats Outboard engines Dive equipment
LTBP’s Special Studies • Biodiversity • Pollution • Sedimentation • Fishing Practices • Socio-economics • Training and Environmental Education • Strategic Action Programme • Legal Convention