480 likes | 594 Views
BREJO – LINEAR PARK. High risk of flooding and cavities. Before the intervention: canalization of the Brejo Creek. BREJO. Basic design: canalization of the Brejo Creek. Opening streets and alleyways
E N D
BREJO – LINEAR PARK High risk of flooding and cavities Before the intervention: canalization of the Brejo Creek
BREJO Basic design: canalization of the Brejo Creek Opening streets and alleyways Canalization of the creek and constructing a pavement alongside, plus green and leisure areas. Removals foreseen :180 households and 308 ‘redistributions’
BREJO Executive design: canalization the Brejo Creek Project modified at the behest of the population
BREJO Presentation of the landscape design
BREJO Appropriation of public space and environmental education
BREJO Appropriation of public space and environmental education
BREJO Appropriation of public space and environmental education
BREJO Situation in February 2008: canalization of the Brejo Creek
RESSETTLEMENT Condominium H Condominium E Condominium C Condominium B AVENIDA PERIMETRAL CEI Condominium G Condominium D Condominium A
RESSETTLEMENT Condominium A (146 HUs) and Condominium B (200 HUs)
RESSETTLEMENT Condominium C (188 HUs)
RESSETTLEMENT Condominium D (123 HUs and 49 commercial units)
RECREATIONAL SPACES
RECREATIONAL SPACES
OPEN CITY DESIGNING COEXISTENCE
URBAN SCHEME CIRO PIRONDI, ANÁLIA AMORIM & RUBEN OTERO
URBAN SCHEME CIRO PIRONDI, ANÁLIA AMORIM & RUBEN OTERO
GROTINHO BOLDARINI, SUZEL & LITO
GROTINHO BOLDARINI, SUZEL & LITO
GROTINHO BOLDARINI, SUZEL & LITO
GROTÃO URBAN THINK TANK
GROTÃO URBAN THINK TANK
GROTÃO URBAN THINK TANK
HOUSING FAZENDINHA ELEMENTAL
HOUSING FAZENDINHA ELEMENTAL
HOUSING FAZENDINHA ELEMENTAL
HOUSING FAZENDINHA ELEMENTAL
ANTONICO RIVER MMBB
ANTONICO RIVER MMBB
ANTONICO RIVER MMBB
ANTONICO RIVER MMBB
JARDIM COLOMBO CHRISTIAN KEREZ
JARDIM COLOMBO CHRISTIAN KEREZ
JARDIM COLOMBO CHRISTIAN KEREZ
Maria Teresa Diniz Secretaria Municipal de Habitacao mtdiniz@prefeitura.sp.gov.br