10 likes | 106 Views
Fusion Industry Innovation Forum (FIIF) Technology Road Map.
E N D
Fusion Industry Innovation Forum (FIIF) Technology Road Map • The next generation tokamak after ITER (= DEMO) shall demonstrate the generation of a significant (several hundred mega watts) amount of electricity to the grid as well as the autonomous operation of the closed fuel cycle. • Two options shall be investigated • DEMO 1 (construction start 2030, Pulsed operation) • DEMO 2 (construction start > 2040, steady state operation) • Development and integration of remote maintenance concepts as a leading requirement of the design • Regulators and utilities should be integrated into the conceptual design process. • Preparation of industry to be involved in the design and systems studies at the start of the design process. • Identify the cost effective technologies that lead to a sustainable design of DEMO on the basis of ITER design and operating experience • To be proposed by a dedicated team of the FIIF under the supervision of the chairman • Close collaboration and tuning with the road map to be developed by the Power Plant Physics and Technology (PPPT) team of EFDA