Transition of ESI IDs from Oncor to AEP TexasWorkshop II July 23, 2019
Regulatory Approval Status The official Regulatory approval timeline & close date of the joint STM application is still unknown at this time. For purposes of this Workshop, the timelines and transition activities will be based on a hypothetical October 1, 2019 initial transition date. Dates may adjust if the PUCT approves a final order after September 12, 2019, the first scheduled open meeting date in September.
Premise/ESI ID Creation Status As of July 10th… • AEP Texas posted the ESI ID Cross Reference List to the July 23rd Transition Workshop II Key Documents. (http://ercot.com/content/wcm/key_documents_lists/183469/ESIID_Cross_Reference_List_7-9-2019.xlsx) • AEP Texas issued a market notice with details related to and referencing the posted ESI ID Cross Reference List. • Oncor sent REP-specific cross reference list to individual REPs serving customers in Oncor’s Mission-McAllen area who are impacted by the transition. Note: AEPTX suppressed all 814_20 ‘ESIID Create’ transactions to reduce confusion in the market. 814_20s will be sent to market when appropriate.
Transition Timelines • Impacted ESI IDs will be transitioned on their regularly scheduled Oncor cycle dates. • ERCOT will provide each REP cross reference lists of ESI IDs for which they are the REP of Record (ROR) seven (7) calendar days prior to the scheduled transition date. • DNP activity should be suspended for transitioning ESI IDs five (5) days immediately preceding the scheduled transition dates. • “True” Switch requests should be submitted to Oncor three (3) business days prior to scheduled transition dates. • Oncor and AEP Texas request that REPs submit MVOs & MVIs at least two (2) business days prior to the scheduled transition dates.
Transition Calendar Tentative calendar for 10/1, 10/11, 10/23 transition dates:
AEP TX & Oncor Cycle Dates- Oct 2019 - The highlighted Transition Dates begin on October 1, 2019. Oncor cycles 5, 12, 20. AEPTX cycles 3, 11, 19. Dates may adjust if the PUCT approves a different transition date.
ESI ID Transition Notes Move Ins & Move Outs • ESI IDs are scheduled to transition on their regularly scheduled Oncor cycle dates. • MVOs must be sent to Oncor 2 business days prior to the cycle date with a requested date of the cycle date. • For transitioning ESI IDs, REPs must submit MVOs coded “B44” to avoid de-energization of premise. • For “true” MVOs, do not send “B44” code. • MVIs must be sent to AEP Texas 2 business days prior to the cycle date with a requested date of the cycle date. • For transitioning ESI IDs, AEP will energize all transition MVIs received. • For “true” MVIs, REPs should coordinate with their AEPTX Account Manager to ensure proper handling. • AEP Texas will waive MVI fees for ESI IDs associated with the transition.
ESI ID Transition Notes (con’t) DNP Moratorium • AEP Texas & Oncor recommend suspension of DNPs 5 days immediately preceding the scheduled transition date. Switch Moratorium • For ‘true’ Switches, the last switch date is 3 business days prior to the scheduled transition cycle date. Historical Usage • Historical Usage requested to be facilitated via AEP Texas’ REPDesk and/or Usage Hub. • 814_26 Ad-Hoc Historical Usage requests will not be supported at the time of transition. Load Profiles • Load Profiles will transfer from Oncor to AEP Texas as-is.
ESI ID Transition Notes (con’t) Critical Care, Chronic Condition, Critical Load • Critical Care, Chronic Condition, & Critical Load designations will be transferred from Oncor to AEP Texas as-is and will be reinstated upon transition. Switch Holds • Switch holds will not be transferred from Oncor to AEP Texas. • REPs can reinstate Deferred Payment Plan (DPP) switch holds with AEP Texas after the transition using the 650_01 Switch Hold process. Substation Codes • AEP Texas will populate Substation Codes for ESI IDs included in the transition to aid REPs in identifying ESI IDs included in the transition.
Contacts for AEPTX-Oncor ESI ID Transition ERCOT David Michelsen (512) 248-6740 David.Michelsen@ercot.com PUCT Cliff Crouch (512) 936-7296 Cliff.Crouch@puc.texas.gov Oncor Chris Rowley (214) 486-3432 Chris.Rowley@oncor.com AEP Texas Jim Lee (512) 391-2972 jclee@aep.com