120 likes | 404 Views
Continuous Gas-Lift Optimization: Offshore Gulf of Mexico. April 13, 2005. Introduction. Background Technical Description Field Criteria Method Costs Qualifications Conclusion. Background. SS 208—50 miles off coast of LA 90% of wells on continuous gas-lift
E N D
Continuous Gas-Lift Optimization: Offshore Gulf of Mexico April 13, 2005
Introduction • Background • Technical Description • Field Criteria • Method • Costs • Qualifications • Conclusion
Background • SS 208—50 miles off coast of LA • 90% of wells on continuous gas-lift • Limited injection gas fluctuates • Inefficient process to optimize gas-lift
Technical Description • Constant Gas-Lift Injection Rate • Real Time Wellhead Surveillance • Optimization Well Tests • Data to Desktop
Field Criteria • Proper gas-lift equipment • Inadequate data gathering from wells • Need to decrease operating costs
Method • New hardware on: • Wellhead • Gas-Lift Header • Test Separator • Computer hardware and software
Costs • Total Cost = $860,000
Qualifications • Internship with UNOCAL at SS 208 • Production Engineering course on gas-lift
Conclusion • Similar field success • Next step • Questions