1 / 22

BULGARIA PRODUCTIVITY

BULGARIA PRODUCTIVITY. PDA INTERNATIONAL. BULGARIA PRODUCTIVITY. PDA INTERNATIONAL PHIL DOWNING - GROUP MANAGING DIRECTOR UK CONSULTANCY 1982 4,000 + EU SUPPORTED PROJECTS BULGARIA MANUFACTURING 1995 CLOTHING / ENGINEERING.

trish
Download Presentation

BULGARIA PRODUCTIVITY

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. BULGARIA PRODUCTIVITY PDA INTERNATIONAL

  2. BULGARIA PRODUCTIVITY PDA INTERNATIONAL • PHIL DOWNING - GROUP MANAGING DIRECTOR • UK CONSULTANCY 1982 4,000 + EU SUPPORTED PROJECTS • BULGARIA MANUFACTURING 1995 CLOTHING / ENGINEERING

  3. BULGARIA PRODUCTIVITY PDA • SALES / TECHNICAL / PLANNING / CONTROL / QUALITY / LOGISTICS • Currently working with over 40 BG companies manufacturing for UK customers

  4. BULGARIA PRODUCTIVITY CONCERNS • GLOBAL INFLATION • RISING COSTS • LOW EFFICIENCY (30%) • STAFF WAGE RISES • SKILLED OPERATOR MIGRATION • CUSTOMERS MOVING FURTHER EAST

  5. BULGARIA PRODUCTIVITY PRODUCTIVITY • HISTORY OF PRODUCTIVITY • 19TH CENTURY INDUSTRIAL REVOLUTION • TAYLOR 1920’s WORKING PRACTICES • USA 1940’s TOTAL QUALITY MANAGEMENT • 1950’s WORK STUDY: Method Study / Time Study • WILSON 1969 PRODUCTIVITY DEALS WITH UK UNIONS • 70’s / 80’s / 90’s MARKET GROWTH • EU FUNDED CONSULTANCY ASSISTANCE SME’s • MANUFACTURING ADVISORY SERVICE • 2000 LEAN

  6. BULGARIA PRODUCTIVITY BULGARIA CURRENT MANUFACTURING SITUATION • LOW EFFICIENCY Estimated 25 to 45% (UK 70%) • RISING COSTS • MIGRATION OF STAFF • ACCURATE COSTING • PRODUCTION PLANNING • MATERIALS SUPPLY • PRODUCTION CONTROL • OPERATOR MOTIVATION / PERFORMANCE • MANAGEMENT SKILLS / TECHNIQUES • GOOD QUALITY CULTURE • MIDDLE & FAR EAST THREAT • EU FUNDING CONFUSIONS

  7. BULGARIA PRODUCTIVITY REFERENCE PERIOD MEASURES • OUTPUT • INPUT • EFFICIENCY • PROFIT PERFORMANCE • COSTS

  8. BULGARIA PRODUCTIVITY STANDARD COSTING A system based on standards which are used to: • Determine sales cost of products • Plan production • Monitor production • Measure variances / take action • Standard / Actual / Variance / Action

  9. BULGARIA PRODUCTIVITY COMPUTATION OF PRODUCT STANDARD COST • Direct Materials usage, cost, contingency, product cost • Standard Hour work content of Product • Direct Wages / Cost per standard hour / Product cost • Total Direct Cost (Materials + Wages) • Overheads / fixed Costs • Total factory / Works Cost • Net Profit • Gross Profit / Contribution • Selling Price to Customer • Contribution per Standard Hour

  10. BULGARIA PRODUCTIVITY PRODUCTION PLANNING • LINE CAPACITY PER WEEK • PRODUCT WORK CONTENT • DELIVERY DATE TARGET • MATERIALS AVAILABILITY

  11. BULGARIA PRODUCTIVITY PRODUCTION CONTROL • To promote action on variances from planning targets: • LINE CAPACITY • LINE EFFICIENCY • CLEAN ORDER / MATERIALS • QUALITY • OTHER

  12. BULGARIA PRODUCTIVITY OPERATOR FINANCIAL INCENTIVE Vital for company success Individual: Daily or weekly Team: Daily or weekly Group: Weekly Factory: Weekly or monthly IMPORTANT TO MEASURE & CONTROL

  13. BULGARIA PRODUCTIVITY FACTORY LAYOUT • Minimum waste ‘LEAN’ on movement of materials in progress. • Ideal factory layout for: FLOW PROCESS CONTROL VISUAL CLEAN & TIDY

  14. BULGARIA PRODUCTIVITY METHODS AND WORK AIDS • Investigate each product for method improvements that reduce the work content and or increases quality standard • Example: Folder for front placket reduces work content by 6 standard minutes • Machinery / Equipment costs, savings and payback by reduction

  15. BULGARIA PRODUCTIVITY LINE SET UP AND BALANCING DEFINITION • ‘LINE SET UP’ is the theoretical plan of a certain style to provide maximum efficiency whilst achieving promised delivery dates.

  16. BULGARIA PRODUCTIVITY INFORMATION REQUIRED • OPERATION BREAKDOWN: Description of operation, method etc • SM’s PER OPERATION: Cycle time based on method & equipment • TOTAL STANDARD MINUTES: For Capacity Planning, costing etc • MACHINE / EQUIPMENT: Basis for standard minutes Eg Integrated sewing unit 3.00 SM’s Plain lockstitch 5.50 SM’s • PLAN QUANTITY PER WEEK: Customer requirement or capacity

  17. BULGARIA PRODUCTIVITY

  18. BULGARIA PRODUCTIVITY

  19. BULGARIA PRODUCTIVITY

  20. BULGARIA PRODUCTIVITY • SUMMARY • REFERENCE PERIOD / HISTORY • STANDARD COSTING • PRODUCTION PLANNING • PRODUCTION CONTROL • FACTORY LAYOUT • METHODS • FINANCIAL INCENTIVE SCHEME • LINE SET UP • QUALITY CONTROL • MANAGEMENT CONTROL • TRAINING • CONTINUOUS IMPROVEMENT

  21. BULGARIA PRODUCTIVITY • PLAN • SHOWCASE PROJECT • EXAMPLE TO OTHER COMPANIES • PROOF OF WHAT CAN BE DONE

  22. BULGARIA PRODUCTIVITY • QUESTIONS • ELECTRONIC COPY OF SLIDES • THANK YOU FOR YOUR TIME

More Related