1 / 4

Quench Antenna Discussion Summary

This is a biweekly meeting to discuss progress and plans related to the quench antenna project. The meetings include updates on past meetings, upcoming tasks, and short-term plans. The discussion covers various topics such as mechanical structure, channel numbering, gain settings, quench propagation, and assembly drawings.

trombley
Download Presentation

Quench Antenna Discussion Summary

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Quench Antenna Discussion Summary Meeting every Friday at 8/10/11am (LBNL/FNAL@IB2/BNL) Past Meetings Kick-off June 07 June 14 https://indico.fnal.gov/event/21024/ June 21 https://indico.fnal.gov/event/21063/ June 28 https://indico.fnal.gov/event/21111/ July 12 https://indico.fnal.gov/event/21211/

  2. To Do / Laundry list • Top priority: • Overlay drawing of the QA with mechanical structure is top priority to identify quench location on structure. – Input from Dan is needed! • To Do • Confirm the channel numbering in DAQ and Antenna (BNL) – done • QA disk distance measurement with tape measure (BNL) – done • Generate an assembly drawing (BNL) – done • Check the gain settings (BNL) – done • Determine the mechanical center of the magnet w.r.t. QA location • Check interface box has capacitors or not,  have them identical.  – done • Check orientation, idea is the coil looks at the inner layer – done • Quench propagation in low field region estimate (Giorgio) • Inner layer: 8mm/ms - done • This will determine the QA distance needed

  3. Short term plan, • Next test in next Thermal cycle with better coverage of QA. 8mm/ms with ~10ms: 16cm spacing or 25 elements needed, e.g. 50 channels. – 2nd thermal cycle cancelled, adapt for A3 • Maxim • Send existing PCB boards and parts to BNL, and schematics for assembly.  – done • Send interface board drawing to BNL – done • BNL • Assemble PCB boards – start week Aug05 • Assemble interface box – not needed • Assemble a cable for 8+1 channels – start week Aug05 • 32 more channels available, cards would need to be bought, 4 more cards ($2.2k/card).  – done • Measure the extra resistors on the boards to ensure is everything is the same – done • Change DAQ range from 1V to 100mV – done • Plastic spacer manufacturing and procurement - get the right length (maybe Maxim has spares).  • -> 3D printed version to go forward as no savings with Delrin rod possible. – done • PCB boards are notched – done • All of them

  4. Before next test • Confirm QA gain settings, and test of full assembly with long cables before insertion. – done • Fermi: • Investigate how more elements can be added. Check if alternative to PCB antenna exists, can be made or re-used (suggestion Stoyan/Joe DiMarco design). • Discuss cost with L2

More Related