1- profil brut (informations initiales)

Ville Sans Tranchée ROSNY s/bois 14 juin 2007. FIL DIRECTEUR : projet de pose d’un fourreau acier Ø 200 pour la mise en place d’un PEHD Ø 125 destiné à l’alimentation en gaz d’un industriel.

truly
Download Presentation

1- profil brut (informations initiales)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Ville Sans Tranchée ROSNY s/bois 14 juin 2007 FIL DIRECTEUR :projet de pose d’un fourreau acier Ø 200 pour la mise en place d’un PEHD Ø 125 destiné à l’alimentation en gaz d’un industriel. C’est un ouvrage de petite longueur –100 m- en milieu semi-urbain avec présence de nombreux réseaux à risques, d’une voie SNCF et d’un canal. 1- profil brut (informations initiales)

  2. 2- profil brut + réseaux

  3. 3- profil brut + réseaux + palplanches

  4. 4- profil brut + réseaux + palplanches + SNCF

  5. 5- profil du forage initial

  6. 6- profil brut + réseaux + palplanches + SNCF + profil du forage initial

  7. 7- profil du forage initial + encombrement + géologie

  8. 8- profil + analyse de risques

  9. 9- profil avec l’analyse de risque

  10. 10- profil avec justifications

  11. 11- profil réel final seul

  12. 12- profil réel final