Meeting on status of calibrations for next seatray production 14-01-2011. Status of T0s calibrations. Agustín Sánchez-Losa (IFIC). I have only knowledge about 6 major calibrations (all done by Paco ) in order to recalibrate all the T0s Incoming set of new T0s for the period #8
E N D
Meeting on status of calibrations for next seatray production 14-01-2011 Status of T0s calibrations Agustín Sánchez-Losa (IFIC)
I have only knowledge about 6 major calibrations (all done by Paco) in order to recalibrate all the T0s • Incoming set of new T0s for the period #8 • 2(3) major sets of interline offsets released (both done by Paco), the last one presented in Paris for the period #4 • Incoming release (if not already done) of interline offsets for the period #6 • For G/2, G/4 and G/8 only calibration runes available for G/2 and G/4 (G/8 not found) • Interline offsets for period #7 and #8 could be performed in a few weeks #1 #2 #3 #4 #5 #6 #7 #8 5 Lines 10 Lines 12 Lines HV L10-L12+offsets HV L6-L9+HV