1 / 11

T owards Sensor Decision for ATLAS IBL

T owards Sensor Decision for ATLAS IBL. LHCC Upgrade session CERN, June, 14 th 2011 G. Darbo – INFN / Genova Indico agenda: https://indico.cern.ch/conferenceDisplay.py?confId= 141306. Sensors Designs for IBL. Not enough data available to make decision on sensors

tucker
Download Presentation

T owards Sensor Decision for ATLAS IBL

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Towards Sensor Decision for ATLAS IBL LHCC Upgrade session CERN, June, 14th 2011 G. Darbo – INFN / Genova Indico agenda: https://indico.cern.ch/conferenceDisplay.py?confId=141306

  2. Sensors Designs for IBL • Not enough data available to make decision on sensors Planar: need more measurement with full radiation dose 3D: yield and production are the major unknowns Both: need adequate statistics on irradiated chip-sensor assemblies • Following discussion in the IBL community and sensor R&D collaborations, IBL Management and Institute Board decided to restrict the IBL design to two: • Planar silicon n-in-n, 200µm thickness, slim edge from CiS • 3D silicon, double side, slim edge from CNM + FBK • To comply with the IBL speedup schedule: • Complete the prototype program while launching pre-production • Enough sensors (to start module production) will be ready of the selected technology when decision will be taken • Wafer to be produced (2x good tiles of IBL modules): • CiS: with the measured yield (good statistics available) – 6 batches of 25 wafers satisfy IBL requirements • CNM+FBK: if yield is 50% are necessary 9/10 batches. If yield is 60% are necessary 8 batches. • Pre-production started: 50 planar (CiS) & 50 3D sensors (FBK + CNM) CNM/FBK wafer mask 8 SC tiles/wafer CiS wafer mask 4DC tiles/wafer

  3. Sensor Review • Sensor review on July 4th and 5th • Review committee with five ATLAS and two non ATLAS members • The IBL Institute Board with the IBL Management plans to decide on one of the two sensor technologies based on the reviewers recommendations. • Upon sensor decision, definite IBL MoU and IBL TDR addendum (new schedule) will be done this summer • Review committee will be asked to evaluate: • Fulfilling the requirements • Look at performance, system issues, production readiness and schedule from foundries, yield and production quantities, risks and risk mitigation • Give a weighted recommendation based on the information available at the review date • Review Committee: • External reviewers: Gino Bolla(CDF), Petra Riedler(ALICE) • ATLAS internal reviewers: KatsuoTokushuku (Chair), Craig Buttar, Marko Mikuz, Sally Seidel, WladekDabrowski • ATLAS ex-officio: Beniamino Di Girolamo, MarzioNessi, Phil Allport,

  4. Sensor Requirements • Sensor requirements for IBL (from TDR): • Radiation Dose: NIEL = 5 x 1015neq/cm2, TID = 250 Mrad • Requirements from system: The target temperature for operating the IBL sensors is approximately -15 ºC, in order to minimize effects of reverse annealing on the sensors and to avoid thermal runaway • IBL design uses evaporative CO2 cooling an titanium pipe. • The measured Thermal Figure of Merit (TFoM) is approximately 13 [Kcm2/W], leading to a sensor temperature of < -20ºC. See simulation in the plot below. Loaded stave temperature: -24.4°C (0.72 W/cm2) • Stave TFoM ~61% • TFoM Heat transfer ~ 19% • TFoM Pressure drop ~20% Unloaded stave temperature: -39°C

  5. Planar Sensor – Slim Edge • IBL selected design the Planar n-in-n technology has→ 200 μmslim edge • Guard rings on p-side are shifted beneath the outermost pixels → least possible inactive edge • Less homogeneous electric field, but charge collection after irradiation dominated by region directly beneath the pixel implant → only moderate deterioration expected 200µm from pixel to dicing strip ~200÷250 µm inactive edge 500µm long pixels Several FE-I4 assemblies made with different thick-nesses (150 & 200µm) and conservative edge (450µm). No IBL design. ~450µm inactive edge 250 µm pixels

  6. 3D Double Side Sensors • FBK and CMN have similar process • FBK full thru columns stopped by membrane. p-spray for pixel isolation • CNM stop etching before reaching opposite end. p-stop for pixel isolation • Expected similar performance in IBL, although variations in the two processes. • Same layout and column geometry in both designs • ~10µm column diameter • FBK full through, CNM column tip 15±7µm from opposite wafer surface. • Production schedule requires aggregate production n+ etched and filled from top p+ etched and filled from bottom 700nm DRIE stopping membrane FBK DRIE: Full thru columns CNM DRIE: Almost full thru columns

  7. FE-I4 Assemblies • 78 FE-I4 single chip assemblies have been bump-bonded at IZM: • 37 with 700 µm FE-I4 thick chips (no thinning of the wafer) • 36 with 470 µm FE-I4 thick chips (minimum thinning without support wafer) • 5 with 150 µm FE-I4 thick chips + 500 µm glass support (total of 660 µm including ~10 µm glue thickness) • Already made assemblies with IBL sensor technologies. • CiS: 35 of which 10 of IBL design • CNM: 16 of which 16 of IBL design • FBK: 17 of which 9of IBL design

  8. Irradiation & Test Beam • Test beam at DESY (4 GeV electrons) in February and April and at CERN now (180 GeVpions). • Non irradiated and irradiated samples with proton (Karlsruhe – 25 MeV), and neutron (Ljubljana – nuclear reactor) • Proton irradiation with devices on PCB – Low proton energy bring high TID (~750Mrad) and ~1÷3 % of pixel dead in the FE-I4 • Bare assemblies irradiated (after test on PCB) in the reactor (activated tantalum by slow neutrons - Ta-182) – reloading on PCB and wirebonding before testing • as function of • Bias voltage • Threshold setting • Incidence angle • Quantities we can measure at TB • Detection Efficiency (incl. Edge Efficiency) • Charge Collection Efficiency • Spatial Resolution • Charge Sharing/Cluster Size • Lorentz Shift • Monitoring available of: • Leakage current • Sensor temperature • measured at DESY Ref: J. Weingarten – IBL GM 8 June 2011

  9. IBL General Meeting, CERN Irradiated Samples device irradiated at IBL target fluence AND with IBL design & thickness

  10. Conclusions • Sensor types for IBL reduced to two technologies and designs • Pre-production started for both • Sensor review in place • Decision for sensors in July 2011 • Irradiated and non irradiated samples of IBL “designs” available and under test • Definite IBL MoU and TDR addendum this summer after sensor selection

  11. Backup slides

More Related