Introduction of ROCSAT-2 Program

Introduction of ROCSAT-2 Program. Dr. Hung-Chih Wang July 24, 1998. Outline. Background of ROCSAT-1 Program Goals of ROCSAT-2 Program Mission Objectives of ROCSAT-2 Program An Overall Architecture of the ROCSAT-2 Program Operation Concepts of Mission

tudor
Download Presentation

Introduction of ROCSAT-2 Program

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. IntroductionofROCSAT-2 Program Dr. Hung-Chih Wang July 24, 1998

  2. Outline • Background of ROCSAT-1 Program • Goals of ROCSAT-2 Program • Mission Objectives of ROCSAT-2 Program • An Overall Architecture of the ROCSAT-2 Program • Operation Concepts of Mission • Summary of ROCSAT-2 System Requirements • Acquisition Strategy of the ROCSAT-2 Program • Current Status of ROCSAT-2 Program • Concluding Remarks

  3. Background of ROCSAT-1 • ROCSAT-1 is a LEO Satellite Containing Three Scientific Instrument; ECP, IPEI, and OCI • During the Development of the ROCSAT-1, NSPO Has Established the Following Capabilities: • human resource to execute a space program • satellite integration and testing facilities • the ground system infrastructure with mission operation center • the infrastructure of space researches at local universities • a successful flight component development program by domestic industry

  4. Goals of ROCSAT-2 Program • To Build-Up a Complete Satellite System with the Achievement of both Civilian Applications and Scientific Research • To Develop and Establish the Core Technology of a Satellite System and Associated Capability at NSPO • To Establish Human Resource Capability in the Area of Both Satellite-Related Technologies and Large-Scale System Engineering • To Enhance the Research in the Space Science and Technology and to Promote the International Cooperation in the Space Community • To Maximize the Use of the Infrastructure and Technologies Developed at NSPO and Domestic Industry

  5. Mission Objectivesofthe ROCSAT-2 Program • To Develop a Low-Earth-Orbit Satellite with the Associated Ground System for • Observing Taiwan Island and Surroundings in a Near Real-Time Scale • Conducting Scientific Research in the Area of Upper Atmosphere Lightning

  6. Mission Objectives ofRemote Sensing Instrument • The ROCSAT-2 Satellite is Capable of Acquiring Image Data Throughout the Island with the Following Applications: • Agriculture and Forestry • Natural Disaster Evaluation • Urban Development and Land Use • Environmental Monitoring • Academic Researches and Education

  7. Mission Objectives ofImger of Sprites • Investigation of the Electrodynamic Coupling Between Clouds and the Upper Atmosphere • To Identify the Global Distribution of Red Sprites • To Identify the Spatial-Temporal Dynamics of Red Sprites • To Explore and Identify the UV-Band Content in the Activity of Red Sprites • To Identify the Activity Degree of the Ionization of Red Sprites

  8. Overall Architectureofthe ROCSAT-2 Program Space Segment Orbit Remote Sensing Instrument Spacecraft Communication Architecture Launch Segment Scientific Instrument Receiving Station TT&C Station Mission Objectives Ground Segment Back-Up TT&C Mission Operation Data Processing Users

  9. Operation Conceptsof theRemote Sensing Instrument • Mission Orbit • Sun-Synchronous • Height: 891 Km • Inclination: 98.99º • One Day Re-Visit of the island • Equatorial Descending Time: 9:30 am - 10:30 am (TBR) • Communication Architecture • Tasking Agility • Viewing Angle at Cross-Track:  45º • Viewing Angle at Pitch:  45º • Image Type: Push-Broom

  10. Mission Orbit • Mission Orbit: 14 rev/day, 891 km, 98.99 deg • Swath> 36 km; Cross-Track Viewing Angel ±45 deg • Parking: 791 km, 98.99 deg Mission Position Parking Position Taipei Latitude (deg N) Longitude (deg E)

  11. Comminication Architecture 10O E/V Day Night AOS • Image Data Downlink • X-Band • Data Rate  150 Mbps • Imaging PAN and/or MSS Simultaneously • Downlink PAN or MSS Data in a Near-Real Time Receiving Station • SOH Data Downlink • Meet Existing S-Band Requirements • Data Downlink Rate 2Mbps • Store and Dump Operation • MSS data • PAN data (Stereo Imaging and when Viewing Angel  30O) Ground Track Receiving Station TT&C Station 20O E/V (Real-Time Downlink Image Data: when Viewing Angel  30O) LOS • Ground Station Requirements: • 8m Dual Channel Antenna • S-Band: G/T  21.0@10OE/V. Angle (clear sky) • X-Band: G/T  26.7@20OE/V. Angle (clear sky) • X-Band Image Data Downlink Rate  150Mbps

  12. Tasking Agility Ground antenna elevation angle 10 deg Ground Track Multiple Strip Imaging Look Backward Pitch = 30 deg End Imaging FOR = 45 deg Rotation Stereo Imaging Look Forward Start Imaging Tasking Agility Cross-track : 30o/60sec 10o/25sec Changing Viewing Duration = 8.1 min Pitch = - 45 degree Basic Swath Swath > 36 km Pitch = + 45 degree 1610 km 968 公里 Ground antenna elevation angle 20 deg Complete three strips of different pitch & roll viewing

  13. Operation Conceptsof theImager of Sprites • The Imager of Sprites will not be ON when Remote Sensing Instrument is Imaging • The Imager of Sprites is Limb-Viewing the Altitude and Lateral Extent of Optical Emissions from Upper Atmospheric Lightning • Viewing Direction: Right-Hand Side Along with the ROCSAT-2 Mission Orbit • One or Two Photometers Will be Used as a Trigger Source for the Imager of Sprites • Viewing Area: 1210 x 181.5 Km2 at a Distance 3467 Km

  14. Summary (1)ofROCSAT-2 System Requirements

  15. Summary (2)ofROCSAT-2 System Requirements

  16. Summary (3)ofROCSAT-2 System Requirements

  17. Acquisition Strategy (1)ofthe ROCSAT-2 Program • NSPO is the Overall System Integrator for the Complete ROCSAT-2 System, Including Spacecraft with Remote Sensing Instrument, Scientific Instrument, Ground System, and Launch Vehicle. Tasks to be Performed: • Define System Requirements • Design the ROCSAT-2 System • Define the Interface between Various Systems and Associated Requirements • Validate End-to-End ROCSAT-2 System

  18. Acquisition Strategy (2)ofthe ROCSAT-2 Program • The ROCSAT-2 Spacecraft will be Designed and Developed Jointly by Both NSPO and Contractor’s Engineers. NSPO will be Responsible for Certain Subsystems, e.g., Primary Structure and Thermal Control. • NSPO will be Responsible for the Integration and Test of the Satellite by Using NSPO I&T Facilities. • Some Key Components and/or Subsystems will be Manufactured by Domestic Industry. • Key Technologies of the EO Sensor will be Transferred to Precision Instrument Development Center (PIDC)

  19. Acquisition Strategy (3)ofthe ROCSAT-2 Program • The Ground Station at National Central University will be the Primary Receiving Station for ROCSAT-2 Image Data. This Ground Station will be Modified to Meet Current System Requirements. • NSPO will Establish a Back-up Image Data Receiving Station and Multi-Mission MOC to Operate ROCSAT-1, -2, and -3. • NSPO will be Responsible for the Overall System Integration of Each Receiving Station when Modified. • The Launch Service will be Small Class Launch Vehicle, e.g., Athena II, Rockot, Taurus-XL, and KOSMOS.

  20. 1997 1998 1999 2000 2001 2002 2003 J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J SRR PDR CDR IRR SAR Launch Milestone 2/28 6/30 1/31 11/30 7/31 6/30 1. Planning Mission Definition & System Design 8/31 S/C RFP 12/31 Satellite RFP's (S/C, P/L) LV RFP 10/15 Sci P/L Sel CA Science Mission Selection Ground System GS Review GS Planning 2. System Development WSD 29M TO P/L Del. P/L Del. CPT Bus & Remote Sensing Instrument 12/1 H/W to NSPO 4/30 7/31 WSD 30M P/L Del. Scientific P/L 1/1 6/30 WSD SAT Comp. Ground System 12/31 12/1 WSD 3. Launch Vehicle Service 3/31 4. Satellite Integration & Testing Spacecraft AIT H/W to NSPO S/C I&T Comp. 18M Ready Sci. P/L I&T TO L/V Site Satellite I&T 11/30 4/30 5. Mission Operations Launch & Early Orbit Flight Operation & Application Master Scheduleofthe ROCSAT-2 Program

  21. Current StatusofROCSAT-2 Program • A Preliminary ROCSAT-2 RFP was Released to Potential Bidders. • A Bidder Conference Will be Held at NSPO on July 30-31. • The RFP of ROCSAT-2 Spacecraft and Remote Sensing Instrument Will Be Released by the End of August 1998. • The SOW of the Imager of Sprites is Under Preparation.

  22. Concluding Remarks • The Entire Work Mentioned in This Presentation Package Was Accomplished Independently by NSPO Engineering Team. The Team Has Completed the Mission Definition Document and System Requirements Document for the ROCSAT-2 System, and the Spacecraft RFP. • The Results of This Effort Demonstrated the NSPO Technical Capability Has Been Established During the ROCSAT-1 Program.