Olivier Brunner, on behalf of RF/MK.

Olivier Brunner, on behalf of RF/MK. RF/MK: 2013 in a nutshell. Linac 4 – HPRF system installation and commissioning. Installation: equipment, waveguides, water cooling, local cabling Upgrade of LEP equipment Contract follow up: new klystrons, spare circulators

tulia
Download Presentation

Olivier Brunner, on behalf of RF/MK.

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Olivier Brunner, on behalf of RF/MK. RF/MK: 2013 in a nutshell

  2. Linac 4 – HPRF system installation and commissioning • Installation: equipment, waveguides, water cooling, local cabling • Upgrade of LEP equipment • Contract follow up: new klystrons, spare circulators • Reliability is a key issue here: RFQ commissioning, phase adjustment

  3. Developments • graphic user interfaces (GUI) • phase adjustment / phase tuners WR 2300, L = 1500 mm, r1=70mm, r2 = 40mm VSWR ≈ 1.2 [depth 0 -> 100 mm] S11 ≤ -30 dB [depth 0 -> 90 mm] Range: ≈ max 60˚

  4. LHC RF System Operation (ACS) D. Glenat • System performed very well: Did not limit the evolution of peak or integrated luminosity • Better performance than in 2011 • Some “weaknesses” have been identified To do list 8 klystrons replaced (new boilers + age profile) HV bunkers equipped with new air cooling systems New klystron heating system Oil tests and reconditioning HV cable repair campaign Thyratron replacement DCCT and tetrode replacement R&D in progress Maintenance …

  5. Solid state crowbars (“fast protection system”) • Sophisticate circuit • Water/oil Cooling • 350 litters oil volume • Limited lifetime • Very simple circuit • No cooling (±10W) • 90 litters oil volume • Solid State device has better performances than the thyratron • Validated during 2012 running period • In series production

  6. Repair of the high voltage connectors Zone with welding defect • Klystron filament glitches responsible for frequent RF trips during operation • Procedure validated to re-weld the connectors without damaging the insulation material • Campaign in LHC will soon be launched

  7. Digital measurement system for the klystron modulators Zone with welding defect • Equipment used in LHC are no longer produced by industry • Development of a FPGA based electronic located in HV modulator • Evaluation tests in progress

  8. A new generation of Arc Detectors for the HPRF systems Zone with welding defect • Presented at the BE-KT day, June 3rd2013 • Agreement between CERN and an external company (Microstep-MIS- Slovak Rep.) to transfer the knowledge

  9. SRF research Sample Testing with the Quadrupole Resonator • Testing of models for SRF loss mechanisms • Studies of new materials and niobium treatments High resolution measurements of the surface resistance Research Highlight: Slow cooling across Tc mitigates flux trapping in bulk niobium and reduces its residual losses.

  10. CTF3 & CTF3 Test Beam Line (TBL) TBL line in CLEX Beam deceleration, measured in spectrometer and compared with expectations Zone with welding defect • CTF3 operation (11 S Band and 1 L Band power sources) • Thirteen PETS tanks installed and commissioned • Full beam transport to end-of-line spectrometer • Power produced (70 MW/PETS): fully consistent with expectations • Max power produced: 720 MW (12 PETS) • Max deceleration: ≈ 36%

  11. Drive beam front end developments Zone with welding defect • Contract (almost) placed with industry for 1 GHz high efficiency klystron • Gun • Sub-harmonic buncher • Beam dynamics

  12. Xbox1: 12 GHz high gradient breakdown tests • Xbox1 reliably working for most of the year • Two structures successfully tested • Test bed for: • LLRF systems • Conditioning and breakdown detection algorithm • Diagnostic tool development Zone with welding defect Test Stand produces reliable results comparable to KEK

  13. Preparation of Xbox2 Zone with welding defect • Xbox2: Second X-band test bench in bld 150 • Modulator installed • Klystron in validation tests at SLAC • Commissioning: Spring ‘14

  14. Next generation of x-band facility: Xbox3 Zone with welding defect • Based on high repetition, low power klystrons • Contract for klystron&modulators placed in August (Toshiba) • Integration work has started

  15. LEP Copper cavities – a new life! London Science Museum CERN, Bld 182 Zone with welding defect • Cavities shipped to: • Pakistan, London, Edinburgh, Madrid, Rome, Berlin, Poland, Norway, Hungary, Denmark, Cern,...