Facilities and Capital Projects. Presentation to Westchester Administrative Staff Council February 1, 2019. MISSION AND CORE VALUES. MISSION
E N D
Facilities and Capital Projects Presentation to Westchester Administrative Staff Council February 1, 2019
MISSION AND CORE VALUES MISSION • The Facilities & Capital Projects team is responsible for operations and maintenance, construction, projects management, space planning and energy sustainability/resiliency management of all of Pace University's leased and owned properties CORE VALUES • COLLABORATION: Work together with the University’s community to achieve a shared vision of creative environments that celebrate our diverse experiences • EXCELLENCE: Create high quality, environmentally lasting solutions • INTEGRITY: Conduct ourselves professionally with honesty and the highest level of integrity in all of our endeavors • INNOVATION, CREATIVITY: Create flexible and adaptive designs/solutions that meet our current and future needs.
NYC Campus PortfolioLeased Properties * Contract under negotiation
Westchester Campus Portfolio * Includes the Environmental Center storage and animal buildings (5 structures)
Building Age * Excludes buildings with only floor leases
Facilities Operations • Staffing • The operations team is a combination of external and internal engineering, custodial and maintenance staff. ABM is contractor managing the custodial and maintenance contract. There are 9 internal staff members and a Director of Facilities Operations. • Open Position: Engineering Manager • Grounds Keeping • Landscaping and Snow Removal • Deferred and Planned Maintenance • Building Operations • Monitoring boilers, HVAC, plumbing, mechanical and engineer systems • Custodial • Business Continuity
Facilities by the Numbers • Work Orders • Average 150 tickets weekly between Pleasantville and White Plains • Average 300 tickets weekly between all NYC owned and leased properties • FY19 – 50 Major Incidents to date • Steam Leaks • Power Outages • Boiler and HVAC Failures • Elevator Failures • Maintenance • Daily Building Rounds • Events • Average 61 event set ups weekly in NYC • Average 43 even set ups weekly in PLV
Energy Conservation Program Cost Sharing Agreement Signed in August, 2017 No Upfront Cost Quickstart Period (Sept. 2017 – Feb. 2018) 50% of the Utility Savings are issued to Cenergistic (From March 2018 On) 2 Cenergistic Energy Specialists – Solely Focused on Pace University Optimize HVAC, Lighting, Mechanical Equipment for Efficient Performance
Specific Initiatives • Building Management Computer Controllers - 161 William • During Night Energy Audits, Energy Specialist Realized HVAC System was Running 24-7 • Instead of Purchasing New Equipment, Energy Specialist was able to Reprogram Existing Controllers to Properly Schedule HVAC System • Anticipated Savings $118,000 a Year • Coffee Maker Schedules • Did You Know there are Restaurant Quality Coffee Makers on Campus that cost over $12,000 a Year to Operate • When Possible, Coffee Makers have been Programmed to Turn Off after 2 hours of inactivity • Anticipated Savings, over $50,000 a Year • Boiler Optimization • Cenergistic Consultant Made Recommendations to Lower Operating Temperatures and unnecessary runtime • Achieved Over $80,000 in Savings this Heating Season
Net Savings Sep. ‘17 – Dec. ‘18 Quickstart Energy Savings (Sep. ‘17– Feb. ’18): $222,500 Shared Savings (Mar. ’18 – Dec. ‘18) : Cenergistic Fees (50% of $159,650): Net Savings to Pace University: $775,000 $387,500 $610,000
Energy Reduction Equates To: Removing 548 Cars Off the Road or Planting 67,419 Trees or Eliminating 2,629 Metric Tons of CO2
Capital Projects • Staffing • The capital projects team includes the new Director of Capital Projects, a project manager and Director of Interior Design • Capital Spend FY15 – FY20: Capital Spend $79,824,853
Capital ProjectsFY15 – FY20 Capital Projects Summary 1 Westchester campus includes any and all projects that span both the PLV & WP physical locations; such as Annual Restroom Renovation Program, Landscape Study, Condition Assessment, etc.
Capital ProjectsMajor Academic Projects • Science Labs Renovation - 1 Pace Plaza • Telehealth Research Lab for Seidenberg – 163 William Street • Lubin Administrative Offices and Classroom Renovations – 1 Pace Plaza • New 150 seat Lecture Hall and Multi-Purpose space in Willcox Hall • Media, Visual Arts and Communications Labs and Classrooms in Willcox Hall • CHP PA Program and Labs, offices, classrooms – Lienhard Hall • Seidenberg Classrooms and student lounge renovations – Goldstein Academic Center • Active Learning Classrooms in both New York and Pleasantville • Student Art Gallery – Choate House • Women’s Justice Center Relocation – Law School
Capital ProjectsMajor Student Life Projects • Residence Hall Furniture Replacements both campus • Residence Hall upgrades • Maria’s Tower – 1 Pace Plaza • North and Martin Halls - Pleasantville • Town Houses - Pleasantville • Dannett Hall – White Plains • 1 Pace Plaza Courtyard • University Health Care center relocations in NY and Pleasantville • NYC Kitchen Renovations and Café 101– 1 Pace Plaza • Student Development and Campus Activities – 41 Park Row • Career Service Relocation from Gannet House to Paton House
Capital ProjectsMajor Administration/Infrastructure Projects • Annual Restroom Restoration Program • Boiler Replacements through out all campuses • 1 Pace Plaza and 41 Park Sprinkler System Installation program • 1 Pace Plaza and 41 Park generator replacements • 41 Park Row Local Law 11 Façade Repair • 1 Pace Plaza HVAC (system 4) Replacement • Elevator Modernization • Mortola Library Chiller Replacement – PLV • PLV Site Generator Replacement – Design
Assessments • Library Master Plan • Classroom Utilization • Space Planning • Facilities Condition Assessment
Maintenance RFP • Current Contract: $ • ABM Janitorial Services • Contract Term Differences • Staffing • Bidding Janitorial, Maintenance and Operations • Bid List:
New Initiatives on the Horizon • New Work Order System – Saber • 50% recycled paper University wide • Landscaping • Developing Furniture and Space Standards • Vendor Spend Evaluation • Facilities Management Dashboard • Continuous Improvement • Customer Service Training • Single Source Opportunities for better Fiscal Management • Paper Supplies • Construction Bundling