Honey Creek OEPA 319 Stream Restoration Project 2008-2009 Pre and Post Construction Photos. 524 Linear Foot Project Area. In-stream Boulder Construction (Rock Cross Vane) for Guiding the Direction of Main Current.
E N D
Honey Creek OEPA 319 Stream Restoration Project 2008-2009 Pre and Post Construction Photos 524 Linear Foot Project Area In-stream Boulder Construction (Rock Cross Vane) for Guiding the Direction of Main Current 75 foot Live Lift Will Defuse the Stream’s High Flow Energy and Prevent Bank Erosion Creation of Point Bar Spillway for Floodwater Release