1 / 6

TGak May Closing Report

TGak May Closing Report. Authors:. Date: 2013-05-16. Abstract. Closing Report of IEEE 802.11 Task Group AK at the 802.11 Working Group Meeting, May 2013, held at Hilton Waikoloa, Big Island, Hawai‘i. TGak Closing Report.

urbano
Download Presentation

TGak May Closing Report

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TGak May Closing Report Authors: • Date:2013-05-16 Donald Eastlake, Huawei

  2. Abstract • Closing Report of IEEE 802.11 Task Group AK at the 802.11 Working Group Meeting, May 2013, held at Hilton Waikoloa, Big Island, Hawai‘i. Donald Eastlake, Huawei

  3. TGak Closing Report • Thanks to Mark Hamilton and Stephen P. Pope who served as Secretary Pro-Tem for the two TGak sessions. • Accomplishments • Received and discussed 4 submissions (see next page) • Met jointly with ARC SC Tuesday morning. • The minutes of this TGak meeting will be in 11-13/425 and an annotated agenda is in 11-13/0404r5. Donald Eastlake, Huawei

  4. TGak Closing Report • Teleconferences • TGak voted to hold 1 hour teleconferences on Mondays, June 3rd, June 17th, and July 1st, at 5pm Eastern US timeto be joint with 802.1Qbz if mutually convenient. Donald Eastlake, Huawei

  5. TGak Closing Report • Presentations • 13/406r4, “P802.1Qbz + P802.11ak Proposed Division of Work”, Norman Finn / Brian Hart (Cisco) • 13/526r0, “Sub-Setting”, Donald Eastlake (Huawei Technologies) • 13/479r0, “Portal diagram with DS using bridged network”, Mark Hamilton (Spectralink) • 13/115r4, “Considerations on AP Architectural models”, Mark Hamilton (Spectralink) Donald Eastlake, Huawei

  6. TGak Closing Report • July Plans • Develop an architectural model for 802.11ak. • Receive and discuss technical presentations. • Consider selection of an Editor. • Joint meeting with 802.1Qbz. • Develop process and timeline for TGak. Donald Eastlake, Huawei

More Related