1 / 8

TG1 Closing Report for May 2013

TG1 Closing Report for May 2013. Authors:. Date: 2013-05-16.

nam
Download Presentation

TG1 Closing Report for May 2013

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TG1 Closing Report for May 2013 Authors: Date:2013-05-16 Notice:This document has been prepared to assist IEEE 802.19. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Hyunduk Kang, ETRI

  2. Abstract This is TG1 closing report from March 2013 interim meeting in Waikoloa, HI, USA Hyunduk Kang, ETRI

  3. Agenda and Results (1/2) • The TG focused on comment resolutions with 61 technical, 1 general, and 20 editorial comments • The TG heard several contributions related to the comments and were accepted as comment resolutions • 43 technical, 1 general, and 20 editorial comments were closed • 18 technical comments were opened • Approved comment resolutions available in 19-12/0057r4 Hyunduk Kang, ETRI

  4. Agenda and Results (2/2) • TG1 created PAR extenstion request document and agreed that WG chair forward the PAR extension request created by TG1 and take any action required to renew the PAR • Agenda available in 19-13/0058r4 • Draft meeting minutes available in 19-13/0076r0 Hyunduk Kang, ETRI

  5. What’s Next? • The TG requested the TG editor to prepare by May 31, 2013, a new 802.19.1 draft which builds upon the DF3.03 and incorporates the changes approved by the TG1 during the May 2013 interim meeting • The TG Kindly ask the 802.19 WG chair to start a new 30-days WG Letter Ballot on the new 802.19.1 draft no later than June 7, 2013 Hyunduk Kang, ETRI

  6. Teleconferences Hyunduk Kang, ETRI

  7. July 2013 Plenary Objectives • Resolve comments all comments from the third Working Group Letter Ballot • Have the draft prepared for a recirculation WG LB after the July 2013 plenary meeting so that the ballot closes before the September 2013 interim meeting • Decide on whether the 802.19.1 draft is ready for the sponsor ballot Hyunduk Kang, ETRI

  8. Targeted TG1 Timeline • Third Working Group Letter Ballot: June 2013 • Recirculation Letter Ballot: August 2013 • Form Sponsor Ballot Pool: July 2013 • Initial Sponsor Ballot: November 2013 • Recirculation Sponsor Ballot: March 2014 • Final WG/EC Approval: July 2014 • RevCom/Standards Board Approval: September 2014 Hyunduk Kang, ETRI

More Related