An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Beam instrumentation MDs T. Lefevre onthe behalf of the BI group 2 September 2014

  2. Outline 2 September 2014 • Review of BI MD activities during Run 1 • BI MD requests for Run 2 • Conclusions

  3. Beam Instrumentation MDs 2 September 2014 What is done in MDs is what cannot be done parasitically during normal beam operation and initial beam commissioning • Special beam conditions • e.g. larger beam emittance using ADT blow-up or different bunch length • Local Orbit bumps or K-modulation • e.g. for cross-calibration of beam profile monitors, BPM or FBCT studies • Intensity scan (scraping) • e.g. for BPM or FBCT sensitivity ranges study • RF frequency change • e.g. for strip-line BPM directivity study in LSSs

  4. Beam Instrumentation MDs 2 September 2014 • During each MDs period – 8h BI Shift • 4-5 different activities per shift • Some in parallel whenever applicable • Usual suspects • BCT, BPM, BSRT, BGI, BWS and Schottky • Typical MDs: • First part with beam tests at injection • Ramp and beam tests at flat-top

  5. Beam Instrumentation MDs 2 September 2014 • Study the performances & limitations of operational devices • Understand / Solve issues that arises during Beam Operation • e.g. BSRT Extraction Mirror heating or FBCT beam position dependency • Study the impact of known limitation • e.g. non-linearity corrections of BPM readings, • Test and develop new or modified instruments • Develop devices not yet operational • e.g. Schottky, LDM, dI/dt, .. • Test hardware modifications • e.g. BSRT gated cameras, LDM optimisation • Test firmware modifications • e.g. Modified Interlock BPM firmware • Commission new Instruments • e.g. Matching Monitors

  6. Results from BI MD - Run1 BSRT / WS calibration Calibration BSRT - WS Emittances after calibration 2 September 2014

  7. Results from BI MD - Run1 Matching Monitor Preliminary Results I=4.48e10 I=2.23e10 I=4.5e9 2 September 2014

  8. Results from BI MD - Run1 BGI – B2 2 September 2014

  9. BI situation after LS1 2 September 2014 • Modified Instruments during LS1 • All of them .. Some more than other … • e.g. Schottky monitor or BSRT B1, .. • Including both Hardware, Firmware, Software changes • New Functionalities and New Instruments • ICT and BCTW for fast beam intensity monitoring • dI/dt (Fast Beam Current Change Monitor - FBCCM) • Diode Orbit system for Collimator BPM and more.. • Beam Transfer Function using Tune monitor • Instability Monitoring system and trigger • Beam Gas Vertex (BGV) detector • BSRT interferometer

  10. Requests for Run 2 2 September 2014 • All what will not be completed during the beam commissioning period for operational BI systems … • BLMs were not part of BI MDs – Done in MPP MDs • Already known requests: • Directional Strip-line BPMs in LSSs: comp between DOROS and WBTN • Bunch intensity study scraping nominal bunches • DOROS, Interlock BPM, dIdt, .. • Bunch length dependency of ICT & BCTW • Running the beam instable (nominal bunches) • Commissioning of Instability Monitoring triggering system • CO bumps - • BPM (non-linearity correction) • Sensitivity of beam position for ICT & BCTW, Schottky monitors • Resolution study of BSRT and WS (at injection and flat top)

  11. Requests for Run 2 2 September 2014 • Already known requests continued • dI/dt (FBCCM) commissioning plan with different beam intensities and energies done with TE-MPE-MS • EmittanceBlow-up using ADT • Cross-calibration between BSRT & WS • Test of new BSRT interferometer on B1 • Investigating the possibility to cross-calibrate WS and BSRT using BTV in dump line • Masking of BTV interlocks limited to safe beam? Can we extract and measure with BTV a nominal bunch at 6.5 TeV ? • Commissioning of BGV • Requiring gas injection • In parallel to Van der Meer scans with SMOKE detector and BWS

  12. Conclusions 2 September 2014 During Run 1, BI MDs were extremely useful, at least for us, to better understand our devices Even if we assume a smooth re-commissioning of operational devices, we would already need several 8 hours shifts to assess the performance of new instruments using non-standard beam conditions Our proposal is to keep a minimum of one BI shift per MD period

  13. Thanks for listening 2 September 2014 LSWG

  14. BSRT – Interferometry (B1) • New project in collaboration with KEK (T.Mitshuashi), SLAC (A.Fisher), CELLS-ALBA (U.Iriso) • Interferometry: non-diffraction limited method widely used in electron machines to measure very small beam sizes Fringes ‘visibility’ contains information of proton beam size 28 Aug 2014

  15. Closed Orbit Bumps • +-4mm @ WS and BSRT • Any new aperture and/or MPP constraint in 2015 to repeat bumps at injection and flat top? 28 Aug 2014

  16. WS-BSRT Commissioning Plan Overview N.B.: • BSRT Interferometry can be done in parallel to imaging • BSRT mirror deformation monitoring can NOT be done in parallel to imaging 28 Aug 2014

  17. BSRTM (mirror) deformation monitoring 28 Aug 2014 • Shack-Hartmann mask • When inserted (just after view port) excludes BSRA • Deformation to be checked with low and high intensity • Can we exclude BSRA during scrubbing and/or high intensity commissioning? • Need MD time with high intensity and no BSRA (assuming MPP ok) ?

  18. Wave front distortion measurements - Hartmann mask T. Mitsuhashi 28 Aug 2014 • Very cheap • Not sensible to floor vibrations • Need • the mask as close as possible to the mirror  normally is ‘destructive’, can’t split light to other devices before the mask • mask-screen lever arm as long as possible

  19. BSRT Interferometry commissioning 28 Aug 2014 • Slits out  test imaging • Setup polarizer • Find horizontal polarization only • Check imaging resolution dependence on rectangular iris aperture • Insert slit H • Setup operational vertical aperture of rectangular iris • Visibility vs slit separation • Determine operational slit separation • Repeat for V • Test H and V measurements

  20. Halo Monitoring via Sync light 28 Aug 2014 Studies for HighLumi Coronagraph? Flipping Micro-Mirrors ? Project just starting, nothing defined, not clear if any tests in 2015