1 / 1

DCB Geneva , Switzerland – July 2013

DCB Geneva , Switzerland – July 2013 . 802.1Qcd PAR Responded to 802.11 PAR comments Editor (Eric Multanen ) to produce a draft for task group ballot after Sept meeting Discussion of an ambiguity in 802.1Qbg CDCP

ursala
Download Presentation

DCB Geneva , Switzerland – July 2013

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. DCBGeneva, Switzerland – July 2013 • 802.1Qcd PAR • Responded to 802.11 PAR comments • Editor (Eric Multanen) to produce a draft for task group ballot after Sept meeting • Discussion of an ambiguity in 802.1Qbg CDCP • Whether the end station can request an SVID value for a channel or can only send 0 initially. • Anoop to produce a presentation describing the problem and two alternative fixes for Sept. • Probably will result in a maintenance item. • New work presentation: Flow control for above 100 Gb/s • Current flow/congestion control mechanisms may have issues at these speedshttp://www.ieee802.org/1/files/public/docs2013/new-gusat-PFC-problemID-0713.pdf • This is likely to take more than our usual pre-PAR investigation time to show feasibility and develop objectives and scope for a PAR. • Consider doing an Industry Connections project for pre-PAR work

More Related