10 likes | 129 Views
DCB Geneva , Switzerland – July 2013 . 802.1Qcd PAR Responded to 802.11 PAR comments Editor (Eric Multanen ) to produce a draft for task group ballot after Sept meeting Discussion of an ambiguity in 802.1Qbg CDCP
E N D
DCBGeneva, Switzerland – July 2013 • 802.1Qcd PAR • Responded to 802.11 PAR comments • Editor (Eric Multanen) to produce a draft for task group ballot after Sept meeting • Discussion of an ambiguity in 802.1Qbg CDCP • Whether the end station can request an SVID value for a channel or can only send 0 initially. • Anoop to produce a presentation describing the problem and two alternative fixes for Sept. • Probably will result in a maintenance item. • New work presentation: Flow control for above 100 Gb/s • Current flow/congestion control mechanisms may have issues at these speedshttp://www.ieee802.org/1/files/public/docs2013/new-gusat-PFC-problemID-0713.pdf • This is likely to take more than our usual pre-PAR investigation time to show feasibility and develop objectives and scope for a PAR. • Consider doing an Industry Connections project for pre-PAR work