PRODUCTION FACILITY HIGHLIGHTS

PRODUCTION FACILITY HIGHLIGHTS. FAST FACTS:. 550,000 Square Feet $40 Million Investment ISO9001 Certification. Yes, that is an 8’ ladder. This very large machine cuts steel coil sheets into blanks and also does roll forming. Inventory of steel blanks.

ursula
Download Presentation

PRODUCTION FACILITY HIGHLIGHTS

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PRODUCTION FACILITY HIGHLIGHTS

  2. FAST FACTS: • 550,000 Square Feet • $40 Million Investment • ISO9001 Certification

  3. Yes, that is an 8’ ladder. This very large machine cuts steel coil sheets into blanks and also does roll forming.

  4. Inventory of steel blanks This is one day’s work --- thanks to a JIT program

  5. Note the detailed cuts Price: $1.2 Million Two more units are on order! A programmable automatic CNC punch press ensures the one millionth part is identical to the first.

  6. Price: $1.5 Million A programmable state-of-the-art CNC shearing machine to make desk parts and drawer fronts.

  7. A row of precisely-tooled press brakes used to form parts for files, desks and pedestals. A couple of other items worth noting…….. Neat! Bright! Clean! Look at that reflection!

  8. This is the beginning of the file line……… The robot selects the correct size blank for the file size that has been programmed ... An automated material storage and retrieval system…..the latest technology available today. Then feeds it to the automated rollers…..

  9. This is the high-rise storage for the steel sheets picked by the robotic retrieval system ALL of the bends required to create a file case are performed by this machine……. Price: $2 Million The next stop is spot welding the braces and O-frame members.

  10. This is the first time human labor touches the product! And take note….. The next stop is where the Multi-O-Frames and top cap assemblies are spot welded.

  11. The case is fitted with the top, bottom and Multi-O-Frame in this fixture Customers marvel at this machine! All welding operations are done simultaneously

  12. Presto ! The finished file case. Chance for error: 0% Elapsed time from when robot sent blank down the line: 7 minutes Humans involved in the process: 2

  13. Overhead paint line carrier system Finished cases waiting (patiently) to be painted

  14. Price: $800,000 New powder coating line

  15. Paint line computer monitoring equipment 3,500 feet of paint line, handling objects of all sizes to be painted in 30 different colors, requires skilled management. Paint line “air traffic controller”

  16. The computer-controlled power and free paint line carriers are bar coded to tell the robotic paint arm what color is to be painted. If a color change is required, the next batch is held to permit purging the old color from the feed lines. If the line is not ready for the next batch, it is sent to a “siding” to wait.

  17. The product is run through a completely contained chemical cleaning line to ensure the finish coat adheres properly.

  18. Once the components have been cleaned, they are ready for the paint application process. Computer-controlled robotic painting arm. The mechanism for this four-head sprayer is computer-programmed with the size and shape of each piece that comes through the line…. ….thus ensuring that each piece is fully and evenly coated. The paint is applied by discs rotating at 10,000 rpm. This system uses less air… ….which means less wasted paint ….which makes it a very “GREEN” process.

  19. Can you believe how clean?! Even the carts are spotless! With a uniform coat of paint applied, it is then time to bake the finish in a computer programmable oven.

  20. Once the paint has cooled, the products are then readied for final assembly and packaging.

  21. Pre-painted coiled steel is used to create lateral file and pedestal drawer bodies. Price: $750,000 It takes a gentle machine and perfect tooling to bend pre-painted steel. This machine makes all the bends necessary to create a finished drawer body.

  22. Once formed, the drawer bodies are moved by air suction cups to the automatic welding fixture.

  23. It starts here… The entire drawer producing line can be seen here. And ends here…

  24. All desk and file tops are laid up in this section

  25. All edge banding is applied automatically.

  26. When manufacturing is complete, all products are then staged for loading on our private carrier’s trailers.

  27. There is not a facility in the industry that is the equal of ours in all aspects of manufacturing. It was designed and built this way for a single purpose. We want to be certain that your customer receives their product ON-TIME COMPLETE andCORRECT That is our pledge to you