27Jan2010 SVD meeting

27Jan2010 SVD meeting. Tsuboyama. Korea DAQ meeting (1st day). Nakao : Trigger/clock information does not come from COPPER. They comes  an independent system. (I am sorry I may have misunderstood the mails between Markus and Wecek .)

usoa
Download Presentation

27Jan2010 SVD meeting

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 27Jan2010 SVD meeting Tsuboyama

  2. Korea DAQ meeting (1st day) • Nakao: • Trigger/clock information does not come from COPPER. They comes  an independent system. (I am sorry I may have misunderstood the mails between Markus and Wecek.) • The common trigger/clock distribution will not be convenient. The  reason will be explained when he comes back and also to  Krakow people. • Itoh: • The same data is transferred to CDAQ and PXD. The system  should be designed to have enough performance to send  to two destinations. • Ushiroda • The high-voltage side signal is transferred in the long cable.  please be careful about the insulation or HV leak. • The Belle structure just outside of Belle is very crowded.  It may not be so obvious to find • Can you adjust APV operation parameters?  My answer is "yes" they are all programmable. • (Probably by) Liu Zhen'An • What kind of connectors will be used? (I could not understand the question)

  3. Korea DAQ meeting (2nd day) There was a discussion about "sender" board of the unified link, slow control...  The back board which Wacek proposed could be a model of the sender card. Itohhas a big concern about sending data from SVD to both CDAQ and PXD. Usually this kind of connection causes degradation of performance. The backboard should be designed to avoid such a dead lock.

  4. Wild pig • On sunday, a wild pig invaded a KEK radiation safety area. I was preparing the slide in KEK and witnessed the pig. KEKannounced that someone estimated that it weighs 130 kg.