1 / 21

National Disaster Risk Reduction and Management Plan (NDRRMP) 2011-2018

National Disaster Risk Reduction and Management Plan (NDRRMP) 2011-2018. Presented by: NDRRMC Secretariat. OUTLINE. 1 . DRRM under RA 10121 1.1 Progress of Implementation Framework (NDRRM Framework) 1.2 Related National Plans and Policies

vadin
Download Presentation

National Disaster Risk Reduction and Management Plan (NDRRMP) 2011-2018

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. National Disaster Risk Reduction and Management Plan (NDRRMP) 2011-2018 Presented by: NDRRMC Secretariat

  2. OUTLINE 1. DRRM under RA 10121 1.1 Progress of Implementation Framework (NDRRM Framework) 1.2 Related National Plans and Policies 2. The National Disaster Risk Reduction and Management Plan (NDRRM Plan) 2.1 NDRRMP Thematic Areas including the goal, objectives and outcomes 2.1 NDRRMP Priority Programs and Projects 3. Implementation of the NDRRM Plan 3.1 Implementation Strategies 3.2 Implementation Mechanisms 3.3 Resource Mobilization 3.4 Monitoring and Evaluation

  3. RA 10121: PROGRESS OF IMPLEMENTATION • The Philippine DRRM Law was signed on May 27, 2010 • Implementing Rules and Regulation was signed on 27 September 2010 and took effect 15 days after • National Disaster Risk Reduction and Management Framework was signed on June 16, 2011 • National DRRM Plan was approved on February 7, 2012 by the National DRRM Council

  4. What is required under RA 10121? • Local DRRM Council (Sec. 10 & 11)– Regional to Municipal and Barangay DRRM Committee under BDC • Local DRRM Office (Sec. 12) – Province-Municipality and BDRRMC. With DRRM Officer and three staff in each LDRRMC. • Local DRRM Plan (Sec. 12 c.6) • Local DRRM Fund (Sec. 21) – at least 5% of IRA with 30% reserved as Quick Response Fund • Accreditation, Mobilization and Protection of Disaster Volunteers (ACDV), National Service Reserve Corps, CSOs and Private Sector (Sec. 13) Accreditation at the local level.

  5. NDRRM FRAMEWORK Safer, adaptive and resilient Filipino communities toward sustainable development RISK FACTORS Hazards Exposures Vulnerabilities Capacities Mainstreaming DRR and CCA in Planning and Implementation Prevention & Mitigation Preparedness Rehabilitation & Recovery Response

  6. 1.4 Related National Plans and Policies • Philippine Development Plan (PDP) 2011-2016 • National Climate Change Action Plan (NCCAP)2011 to 2028 • National Security Plan

  7. 2. The National DRRM Plan • Four distinct and mutually reinforcing Thematic Areas

  8. 2. NDRRMP Thematic Area 1: Disaster Prevention and Mitigation

  9. 2. NDRRMP Thematic Area 1: Disaster Prevention and Mitigation

  10. 2. NDRRMP Thematic Area 2: Disaster Preparedness

  11. 2. NDRRMP Thematic Area 2: Disaster Preparedness

  12. 2. NDRRMP Thematic Area 3: Disaster Response

  13. 2. NDRRMP Thematic Area 3: Disaster Response

  14. 2. NDRRMP Thematic Area 4: Disaster Rehabilitation and Recovery

  15. 2. NDRRMP Thematic Area 4: Disaster Rehabilitation and Recovery

  16. 2. NDRRMP Priority Programs and Projects • Development of the following plans  Joint work plan for DRRM and CCA, Local DRRM plans , National Disaster Response Plan (to include a system for Search, Rescue and Retrieval SRR; scenario-based preparedness and response plans), Risk financing • Development IEC and advocacy materials on DRRM and CCA • Development of guidelines  Communications and information protocol before, during and after disasters; Creation of DRRM teams; Criteria/standards for local flood early warning systems; Evacuation; Infrastructure redesign and/or modifications; Manual of operations of disaster operations centers • Development of tools  DRRM and CCA mainstreaming in the national and local-level planning, DANA and Post-DANA; Psychosocial concerns • Establishment of  DRRM Training Institutes; End-to-End local flood early warning systems through integrated and sustainable management river basins and water sheds; local DRRM Councils and Offices and their operations centers

  17. 2. NDRRMP Priority Programs and Projects • Conduct inventory of existing DRRM and CCA resources and services • Development and implementation of DRRM and CCA activities using the 5% of government agency’s GAA • Hazard and risk mapping in the most high-risk areas in the country • Institutional capability program on DRRM and CCA for decision makers, local chief executives, public sector employees, and key stakeholders • Mainstreaming DRRM and CCA in local development planning. • PDNA capacity building for national government agencies, regional line agencies, and local offices • Review, amend and/or revise the Building Code and integrate DRRM and CCA; Executive Order no. 72 s. 1993 (comprehensive land use plans); Implementing Rules and Regulations of RA 10121; Various related environmental policies

  18. 3. Implementation of the NDRRMP • 3.1 Implementation Strategies include Advocacy and Information, Education and Communication (IEC), Competency-based capability building, Education on DRRM and CCA for all, Institutionalization of DRRMCs and LDRRMOs, Mainstreaming of DRR in all plans, to name a few. • 3.2 Implementation Mechanisms: • Integration of DRRM into relevant national plans such as the Philippine Development plan • Development and implementation of respective action plans of government agencies as indicated in the NDRRM Plan. • Roles and responsibilities of the NDRRM Council, Office of Civil Defense, Agency Leads and Partners, and the Regional/Provincial/Local Disaster Risk Reduction and Management Councils

  19. 3.3 Resource Mobilization • General Appropriations Act (GAA) – through the existing budgets of the national line and government agencies • National DRRM Fund • Local DRRM Fund • Priority Development Assistance Fund (PDAF) • Donor Funds • Adaptation and Risk Financing • Disaster Management Assistance Fund (DMAF)

  20. 3.2 Monitoring and Evaluation • Results-based programming shall be used in ensuring that implementation is on time and learning from experiences is built into the DRRM system • OCD and the members of the Technical Management Group will develop a standard M&E template • The stepwise M&E process includes the LGU, regional and national levels • Will likewise use the HFA Monitoring Tool as a working format to undertake national multi-stakeholder consultation processes as progress is reviewed and challenges are systematically identified

  21. Thank you for your attention.

More Related